Download Print this page

Pentair SOLEO CL Installation And User Manual page 8

Advertisement

Installation organisation
However installing the probes in a bypass is advised (SB-PD-PRO-005B) which slightly optimises the quality
of the measurement and the service life of the probes. The installation of the chlorine probe holder is described
in its own operating instructions. To prevent the probe holder being obstructed, installing a pre-filter
upstream is necessary. However SOLEO CL is supplied with 2 probe holders intended for clamp saddles,
ensuring quick installation.
- Sampling faucet
- Installing a pre-filter
before the probe holder is
necessary (not supplied).
- The hydraulic network must be linked to the earth
to prevent the precision of the probes being altered.
!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
!
No a n a l ys i s !
! ch a m b e r ow !
!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
06
SOLEO
CHLORINE
®
F I LT R AT I O N ,
P H
&
O R P
15:15 Water:+28.4°C
Filtration : ON
Chlorine: 13.1mg/L
Air:+27.9°C pH: 7.3
ESC
VALID
The flow-switch of the amperometric chlorine probe detects an absence of flow. The
chlorine regulation is disabled. Check the correct operation of the hydraulic equipment.
- The probe cables must not cross the power
cable in the channel.
- Amperometric chlorine probe
(not supplied).
- Flow switch of the sensor bowl
(not supplied).
- The probes must be placed
after filtration and before
the disinfection and heating
pump.
- Limit the flow to fill the
bowl (0.5 L) in 1 minute.

Advertisement

loading