Operation

Operation
Operation
Checklist Before
Before Starting
Checklist
Checklist
Before
• Check the compressed air supply according to its
operator manual. Make sure the air being supplied
is clean and relatively free of moisture and oil
to prevent water contamination of the air control
components.
• Make sure air delivery valves are closed before the
air supply compressor is started.
• Make sure all required hose restraints and coupler
pins are in working condition and properly installed.
• Make sure the equipment is situated on level
ground. Failure to keep the unit on level ground
will make it difficult or impossible to purge all of the
air from the pressure vessel.
• Make sure the equipment is properly supported on
a surface that can hold its total weight. The weight
of all personnel, the material being blasted, and
any abrasive being stored must also be considered
(see
Technical Specifications, page
• Make sure the water tank will remain fully supplied
with clean water to avoid any possibility of the
pump running dry during blasting.
• Make sure that the pot is clean and free of any
internal debris.
• Make sure to use the correct type of blast control.
An electric or pneumatic blast control switch can
334666C
Starting
Starting
50).
be used with hose lengths less than 150 ft (45 m).
Blasting with 150 ft (45 m) or more of blast hose
requires the use of an electric blast control switch.
• Make sure the blast hose is laid out as straight as
possible between the equipment and the work site
(a coiled blast hose will uncoil under pressure).
Sharp bends in the blast hose could cause the
abrasive to wear through the hose and cause
premature failure of the hose.
• Make sure the rubber gasket in each hose coupler
is in working condition.
Lifting the
the Trailer
Trailer Systems
Lifting
Lifting
the
Trailer
• Lift the system with a lift apparatus rated
appropriately for the weight of the system (see
Technical Specifications, page
• Do not lift the system by the lift ring on top of the
compressor.
• Do not lift the system by the tie-down rings on the
trailer.
• Do not lift the system by the lift rings on the pot.
Operation
NOTICE
NOTICE
NOTICE
Systems
Systems
50).
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecoquip eq400t

Table of Contents