Nortel Enterprise 1000 Reference Manual page 129

Succession communication server, circuit card
Table of Contents

Advertisement

Table 28
Pad switching algorithm
Port B
IPE line
Universal trunk
(TRC)
IPE tie (VNL)
PE line
PE CO/FX/WATS
(TRC)
PE tie
Note: Transmit and receive designations are from and to the Succession CSE 1000. Transmit is from the
Succession CSE 1000 to the external facility (digital-to-analog direction in the E&M trunk card). Receive is
to the Succession CSE 1000 from the external facility (analog-to-digital direction in the E&M trunk card).
Succession Communication Server for Enterprise 1000 Circuit Card Reference Guide
See Table 28 for the pad switching control for the various through
connections and the actual port-to-port loss introduced for connections
between the E&M trunk card and any other IPE port designated as Port B.
Figure 45 on page 130 shows the pad switching orientation.
Port B pads
Transmit
Receive
D to A
A to D
N/A
N/A
Out
Out
In
Out
N/A
N/A
Out
Out
Out
Out
NT8D15 E&M Trunk Card
E&M Trunk Pads
Transmit
Receive
D to A
A to D
Out
In
In
In
In
Out
Out
In
In
In
In
In
Page 129 of 236
Port-to-port loss (dB)
Port B to
E&M to
E&M
Port B
2.5
3.5
0
0
0
0
3.0
4.0
0
0
0
0

Advertisement

Table of Contents
loading

Table of Contents