Jacuzzi J-200 Series Owner's Manual page 19

Table of Contents

Advertisement

9. Select the power supply inlet you want to use (Figure A). Feed power
cable to control box, then install it through the large opening provided
in the bottom side of the box.
10. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figure C, page 16). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
11. Install control box door and screws and reinstall the cabinet side
panels.
2
5
Note: Equipment location (such as pumps, CLEARRAY system, drain,
heater etc.) varies by model.
1.
Control Box
2.
Power Supply Inlet(s)
3.
2-Speed Pump
4.
Heater
5.
Pump Drain Plug(s)
6.
1-Speed Pump
7.
CLEARRAY Water Purification
System
Figure A
Equipment Area
9
12
1
4
6
11
10
3
8.
CLEARRAY Water Purification
System Ballast
9.
Control Panel
10. Drain
11. Optional SmartTub™ System
12. Bridge (Optional for SmartTub
System)
J-200
7
8
2
5
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

J-275J-235J-245J-225J-215J-280 ... Show all

Table of Contents