Acceptance Of An F-System; Archive Step 7 Projects - Siemens SIMATIC S7 F Manual

Systems
Table of Contents

Advertisement

Safety
7.5

Acceptance of an F-System

An F system is usually accepted by an independent expert.
During acceptance of an F-System you are supported by special functions in
SIMATIC Manager. This enables you to:
Compare Safety Programs
Log Safety Programs
Print Safety Programs
You can find information on these topics in Section 5.4.
Safety Note – Archive STEP 7 Projects
!
Version management must be available for the purpose of archiving the S7 F/FH
Systems project. Apart from that, we recommend you archive each accepted
project in STEP 7 and create a new project for changes.
When the system is accepted, all requirements contained in the report on the
certificate that require approval must be taken into account.
You can archive all data relevant to the acceptance of the F-System in SIMATIC
Manager (File > Archive) and print it out, as required.
Check Lists for Acceptance
You can find the following check lists in the appendix. These can be used when
you accept S7 F/FH Systems:
Check list for the life cycle of the fail-safe programmable controllers – contains
a summary of the activities in the life cycle of S7 F/FH Systems, as well as
references to the requirements and rules that must be complied with.
Check list of the certified modules
Check list of the certified blocks
7-14
Fail-Safe Systems
A5E00085588-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7 fh

Table of Contents