Connect External Cables; Connect Prime Power; Converter Idu Modules Management - Comtech EF Data MN/LBC4000.IOM Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

LBC-4000 L-Band Up/Down Converter System
Installation and Startup
3. Install the unit into the front of the equipment rack. Ensure that the slides
properly engage the cabinet-mounted slide rails.
4. Continue to slide the unit into the equipment rack to its final operating
position. Then, use four user-provided screws to secure the unit to the
equipment rack's right and left threaded front rails (through the front panel
slots).

3.3 Connect External Cables

Proceed to connect all external cables to the connectors outlined in the next
chapter (Chapter 4. REAR PANEL CONNECTIONS). Should difficulties occur, call
Comtech EF Data Product Support for assistance.

3.4 Connect Prime Power

An IEC-60320 Type C13 (female) three-prong plug power cord for 90-125VAC or
205-240VAC power sources is provided with the converter. This detachable
power cord mates with the AC Prime Power Module IEC-60320 Type C14 male
connector on the rear of the converter chassis.

3.5 Converter IDU Modules Management

The LBC-4000 comes preassembled as ordered for the specific customer
application. In the event removal or replacement of the Up or Down Converter
IDU Modules is required, complete instructions are provided in Appendix A.
UP/DOWN CONVERTER IDU MODULE REMOVAL/RE-INSTALLATION.
3–8
MN/LBC4000.IOM
Revision 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lbc-4000Cd-mnlbc4000

Table of Contents