Connecting The Prime Power; Connecting External Cables; Removing Or Installing Converter Modules - Comtech EF Data LBC-4000 Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

LBC-4000 L-Band Up/Down Converter System
Installation
2.3

Connecting the Prime Power

A power cord for connection to 90‐to‐125VAC or 205‐to‐240VAC power sources is provided with 
the  LBC‐4000.  This  detachable  power  cord  mates  with  the  AC  Prime  Power  receptacle  on  the 
LBC‐4000 rear panel. 
2.4

Connecting External Cables

Proceed  to  connect  all  external  cables  to  the  LBC‐4000  rear  panel  connectors  as  outlined  in 
Chapter 3. REAR PANEL CONNECTORS. Should difficulties occur, call Comtech EF Data Customer 
Support for assistance.  
2.5

Removing or Installing Converter Modules

The  LBC‐4000  comes  preassembled  as  ordered  for  the  specific  customer  application.  In  the 
event  removal  or  replacement  of  the  up/downconverter  modules  is  required,  complete 
instructions  are  provided  in  Appendix  A.  UP/DOWNCONVERTER  IDU  MODULE  REMOVAL/RE‐
INSTALLATION. 
2–7
Revision 4
MN-LBC4000A

Advertisement

Table of Contents
loading

Table of Contents