SECTION 5 - TECHNICAL DATA
UPPER
HOUSING
(D)
LOWER
HOUSING
NON-SKID
ELASTOMERIC
PAD
Read the following instructions before beginning
installation.
1. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal draw-
ings or as otherwise recommended.
2. Set isolators on floor, housekeeping pad or sub-
base, ensuring that all isolators centerlines match
the equipment mounting holes. The VMC group
recommends that the isolator base ("B") be in-
stalled on a level surface. Shim or grout as re-
quired, leveling all isolator bases to the same
elevation (0.25-inch maximum difference can be
tolerated).
3. Bolt or anchor all isolators to supporting structure
utilizing base slotted holes ("C").
92

ONE INCH DEFLECTION ISOLATOR INSTALLATION

POSITIONING
PIN (H)
0.25" min - 0.5" max
(C)
(B)
4. Place equipment on top of isolators making sure
that mounting holes of the equipment line up with
isolator positioning pin ("H").
5. Equipment or machine is at its full operating
weight.
6. Adjust each isolator in sequence by turning spring
adjusting bolt ("D") one full counterclockwise
turn at a time. Repeat this procedure on all isola-
tors, one at a time.
7. Continue adjusting each isolator until a minimum
of 0.25" clearance is achieved between the lower
housing and upper housing. See illustration above.
8. Fine adjust isolators to level equipment.
FORM 201.28-NM1.1
ISSUE DATE: 1/31/2018
EQUIPMENT
BASE
(C)