Gigabyte GS-SR326 System Installation Manual

Rack mount/tower server

Advertisement

Quick Links

GS-SR326
Rack Mount / Tower
System Installation Guide
Dual Xeon
Processor Motherboard / Server Solution
TM
Rev. 1001
22ME2-SR326-00

Advertisement

Table of Contents
loading

Summary of Contents for Gigabyte GS-SR326

  • Page 1 GS-SR326 Rack Mount / Tower System Installation Guide Dual Xeon Processor Motherboard / Server Solution Rev. 1001 22ME2-SR326-00...
  • Page 2: Table Of Contents

    Step 2-6: Hard Disk Driv e Installation ............. 13 Step 2-7: Reinstall Top Cov er ..............14 Step 2-8: Accessory Kits Installation ............. 14 Chapter 3 Appearance of GS-SR326 ..........18 3-1: Front View of GS-SR326 ..............18 3-2: Rear View of GS-SR326 ............... 18 3-3: Sw itch and LED Indicators Description ............
  • Page 3: Safety, Care And Regulatory Information

    Introduction Safety, Care and Regulatory Information L Important safety information Read and follow all instructions marked on the product and in the documentation before you operate your system. Retain all safety and operating instructions for future use. * The product should be operated only from the type of power source indicated on the rating label. * If your computer has a voltage selector switch, make sure that the switch is in the proper position for your area.
  • Page 4 GS-SR326 Rack mount/Tow er Serv er * To reduce the risk of fire, use only No. 26 AWG or larger telecommunications line cord. * Do not plug a modem or telephone cable into the network interface controller (NIC) receptacle. * Disconnect the modem cable before opening a product enclosure, touching or installing internal components, or touching an uninsulated modem cable or jack.
  • Page 5 Introduction Your telephone company may make changes in its facilities, equipment, operations, or procedures that could affect proper operation of your equipment. If t h ey do, you will be notified in advance to give you an opportunity to maintain uninterrupted telephone service. The FCC prohibits this equipment to be connected to party lines or coin-telephone service.
  • Page 6 GS-SR326 Rack mount/Tow er Serv er NOTICE: The Load Number (LN) assigned to each terminal device denotes the percentage of the total load to be connected to a telephone loop which is used by the device, to prevent overloading. The termination on a loop may consist of any combination of devices subject only t o the requirement that the sum of the Load Numbers of all the devices does not exceed 100.
  • Page 7: Introduction

    Introduction Introduction Welcome to the Gigabyte GS-SR326 Rack mount / Tower Server System I nstallation Guide. The guidebook provides instructions for configuration hardware for the GS-SR326 to your system. This installation guide will assiste you in installing all the essential components for the sever system.
  • Page 8: Chapter 1Introduction

    GS-SR326 Rack mount/Tow er Serv er Chapter 1 Introduction Features Summary Motherboard — GA-8EGXDR — Dual socket 603 for Intel FC-PGA Xeon processor suopprts ® 1.8 GB to 2.8GB and upper — Intel Pentium 4 Xeon 400MHz FSB ® — 512KB internal cache depend on CPU Chipset —...
  • Page 9 Introduction Buiild-in I/O Ports — One Floppy port (up to 2.88MB) — One Parallelport (EPP/ECP) — Two Serial ports — 4 USB ports Version 1.1 — One RJ45 LAN ports — PS/2 Keyboard and Mouse connectors BIOS — Licensed Award BIOS, 4Mb flash ROM Power Supply —...
  • Page 10: Chapter 2 System Hardware Installation

    GS-SR326 Rack mount/Tow er Serv er Chapter 2 System Hardware Installation PLease remove the protective thin films (top and button) from the server when installing. Step 2-1: Chassis Removal 1. Push down the two buttons located at two sides of the chassis.
  • Page 11: Step 2-3: Heat Sink Installation

    Hardw are Installation Process 3. The noticed corner should point toward the end of 4. Then, align the CPU and insert it into the socket. lev er. The CP U will only it in the orientation as Then, push the lever to the original position. shown below.
  • Page 12: Step 2-4: Memory Installation

    GS-SR326 Rack mount/Tow er Serv er Step 2-4: Memory Installation 2. Align the memory notch to the module and push 1. The DIMM slot has a notch, the DIMM memory the memory into the DIMM socket. module only fit in one direction.
  • Page 13: Step 2-6: Hard Disk Drive Installation

    Hardw are Installation Process Step 2-6: Hard Disk Drive Installation 2. Pull out the Hard Disk try. 1. Uncrew the thumbscrew from the front of server. 3. Hard Disk Tray 4. Place hard disk into the hard disk tray. 5. Secure hard disk in the hard disk tray with 6.
  • Page 14: Step 2-7: Reinstall Top Cover

    GS-SR326 Rack mount/Tow er Serv er Step 2-7: Reinstall Top Cover 1. Gently apply force to the indentures with your thumbs and push toward the chassis to replace the top cover. Step 2-8: Accessory Kits Installation 1. Accessory kits introduction.
  • Page 15 Hardw are Installation Process Top plastic cover Lock bracket 2. Remove CR-R door. 3. Secure lock-bracket with screw. 4. Make sure lock-bracket is firmly screwed. 5. Reinstall CR-R door.
  • Page 16 GS-SR326 Rack mount/Tow er Serv er 6. Follow the direction shown in the pict u re to install 7. Gripping the hook into the system as the cip the front bezel. circle pointed. 8. Then, push the other side of bezel LED into the system.
  • Page 17 Hardw are Installation Process 11. A ssembly hinge cover acccseeory w ith 2 12. Installation completed. screws. 13. Insert t o p plast i c cover follow the arrow direct i on. 14. Secure the cover with srews as the clip circles show.
  • Page 18: Chapter 3 Appearance Of Gs-Sr326

    GS-SR326 Rack mount/Tow er Serv er Chapter 3 Appearance of GS-SR326 3-1: Front View of GS-SR326 Slim type CD-ROM (optional) Six Hot-swappable SCSI HDD Slim type FDD 2 x 5.25” bay space 3-2: Rear View of GS-SR326 7 * PCI full-height Add-on cards...
  • Page 19: 3-3: Switch And Led Indicators Description

    Hardw are Installation Process 3-3: Switch and LED Indicators Description Reset Switch Sleep Switch Buzzer Stop Switch Error LED Power LED HDD Access LED Acting Color Status Push Gently Sleep mode Sleep Switch Push Gently Reseting Reset Switch Push Gently Buzzer stop Buzzer Stop Switch Green...
  • Page 20: Chapter 4 Appendix

    GS-SR326 Rack mount/Tow er Serv er Chapter 4 Appendix 4-1: Connector Icon Description Suggest Icon Description Keyboard Mouse Parallel Port Serial Port...

Table of Contents