Lochinvar EcoForce EF80 Installation, Commissioning, User And Maintenance Instructions page 92

Wall mounted gas fired condensing water heater
Table of Contents

Advertisement

EF180
pre adjustment settings gas valve for BIC water heaters
Water heater
Type
EF 80
EF100
EF120
EF150
EF180
* Both gas valves must be opened this number of turns.
21.2.4
Table 2
Pressure adjustment settings LEFT valve
Water heater
Type
EF120
EF150
EF180
21.2.5
Table 3
Maximum fan speed has to be reduced to convert the boiler into a propane or B/P appliance.
Setting of parameter P4BD.
A sticker has to be pasted after converting the boiler into a propane or B/P appliance.
Mark the used gas and the parameter setting on this sticker.
G31 P
BUTANE/PROPANE
G30/G31 B/P
BUTAN/PROPAN
BUTANO/PROPANO
BUTAAN/PROPAAN
max load
min load
Nat. Gas G20 / G25
1.5
3.5
2.25 *
2.25 *
4.25 *
Nat. Gas G20 / G25
-2 to 0 Pa
-2 to 0 Pa
-2 to 0 Pa
PROPANE
PROPAN
PROPANO
PROPAAN
CO
2
10,8 %
10,6 %
9,3 %
9,1 %
Number of turns open (counter clockwise)
Propane G31
0.75
1.5
1 *
1 *
2.25 *
"p-out" pressure at gas valve
Propane G31
-4 to -2 Pa
-7 to -5 Pa
-7 to -5 Pa
P4BD = 1
P4BD = 2
adjust
O.K.
adjust
adjust
O.K.
adjust
0.5
1.25
0.75 *
0.75 *
2 *
O
2
4,8 %
5,1 %
7,0 %
7,3 %
Butane G30
Butane G30
-5 to -3 Pa
-8 to -6 Pa
-8 to -6 Pa
92

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents