Procedure For Initial Lighting; General; Firing For The First Time - Lochinvar EcoForce EF80 Installation, Commissioning, User And Maintenance Instructions

Wall mounted gas fired condensing water heater
Table of Contents

Advertisement

P
F
I
ROCEDURE
OR
If the unit is to operate on LPG refer to section
G
ENERAL
Check the gas pressure available at the gas connection pipe of the water heater. Use the pressure nipple (3) of the gas safety valve for this
measurement. The gas pressure for the water heater, to operate properly under the correct load, must be at least 20 mbar.
The graphs below show the position of the pressure nipple (3) for the complete water heater range.
F
F
T
F
IRING
OR
HE
IRST
After the commissioning of the water heater, the water heater display will show the following graph.
Display message
Reason
Water heater is active, but there is no heat demand.
The display describes:
The actual operation
If a heat demand is activated
The temperature setting
The temperature measured
When mounting the bottom part of the siphon, before commissioning the boiler and/or after maintenance,
it must ALWAYS be completely filled with water.
This is a safety measure: the water in the siphon keeps the flue gases from leaking out of the heat
exchanger via the condensate drain.
When the water heater receives a heat demand the electronics will start the operation of the water heater. Before the water heater is used,
the water heater burner must be adjusted and set at the minimum and maximum load.
L
NITIAL
IGHTING
T
IME
W A T R H T R : N o
>
> >
1 2 3
LPG fuel
before proceeding
d e m a n
.
4 ° C (
1
2 3
d
.
4
° C
)
87

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents