Gas Supply; Service Pipes; Meters; Gas Supply Pipes - Lochinvar EcoForce EF80 Installation, Commissioning, User And Maintenance Instructions

Wall mounted gas fired condensing water heater
Table of Contents

Advertisement

GAS SUPPLY

The Lochinvar E
F
™ range is suitable for use on second and third family gasses 2H - G20 - 20mbar and 3P – G30 – 50mbar/G31 -
CO
ORCE
37mbar. Details relating to Natural Gas (2H) appear below; for details relating to Butane/Propane (3P) please refer to
S
P
ERVICE
IPES
The local gas distributor must be consulted at the installation planning stage in order to establish the availability of an adequate supply of gas.
An existing service pipe must not be used without prior consultation with the local gas distributor.
M
ETERS
A new gas meter will be connected to the service pipe by the local gas distributor contractor. An existing gas meter should be checked,
preferably by the gas distributor, to ensure that it is adequate to deal with the rate of gas supply required.
G
S
P
AS
UPPLY
IPES
Supply pipes must be fitted in accordance with IGE/UP/2. Pipework from the meter to the equipment must be of adequate size. The complete
installation must be purged and tested as described in IGE/UP/1. Refer to
B
G
S
OOSTED
AS
UPPLIES
Where it is necessary to employ a gas pressure booster, the controls must include a low-pressure cut-off switch at the booster inlet. The local
gas distributor must be consulted before a gas pressure booster is fitted.
P
-R
C
LANT
OOM
ONTROL
A manual valve for plant-room isolation must be fitted in the gas supply line. It must be clearly identified and readily accessible for operation,
preferably by an exit.
E
G
S
QUIPMENT
AS
YSTEM
An approved gas inlet appliance isolating valve and union should be installed for each unit in a convenient and safe position and be clearly
marked. Ensure that the gas inlet appliance isolating valve is in the OFF position. Although the equipment receives a gas leak check and gas
train component integrity check prior to leaving the factory, transit and installation may cause disturbance to unions, fittings and components.
During commissioning a further test for tightness should be carried out on the equipment gas pipework and components.
Care must be taken not to allow leak detection fluid on or near any electrical parts or connections.
V
ALVE
L
C
EAK
HECK
LPG FUEL.
for information on LPG pipework installation guidance.
LPG FUEL.
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents