WATER CONNECTIONS

EcoForce water heaters must always be installed with a suitable buffer vessel and Bronze shunt pump; suitable bronze shunt pumps and
buffer vessels will always be quoted alongside the EcoForce water heater.
Failure to install a suitable Glanded Bronze shunt pump and buffer vessel will render all warrantees on the
EcoForce water heater null and void.
The type and number of EcoForce water heaters as well the pipe length and number of buffer vessels must be taken into account
when sizing the interconnecting pipework, the pipe should be sized to ensure the correct flow through the EcoForce water heater.
Error! Reference source not found. gives general guidance on pipe header sizing based on small <14meter pipe runs, additional help w
ith sizing the pipework header is available please contact Lochinvar Technical Support.
I
S
NSTALLATION
CHEMATIC
10.1.1
1 E
F
™ with 1 Lochinvar storage vessel- Vented installation
CO
ORCE
D
RAWINGS
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents