Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before
operating.
Failure to do so can result in death or
electrical shock.
1.
Unplug washer or disconnect power.
2.
Turn off the water supply to the washer.
3.
Remove the drive belt (See page 4-31).
15/16" Nut
Basket Pulley
Drive Belt
reMOve BaSkeT PuLLeY
4-33
4.
Block the pulley to the rear of the tub to
keep the spin basket from moving.
5.
Remove the 15/16" nut securing the pulley
to the spin basket.
6.
Pull the pulley off the shaft.
nOTe: When reinstalling the 15/16" nut
make sure it is tightened to between 50-60
foot pounds. If not tightened sufficiently the
washer may produce knocking noises that
sound like a failed bearing.