Installation Instructions; Remove Transport System - Maytag MHN33PD Installation Instructions Manual

Commercial front-load washer
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS

Remove Transport System

Max. packed weight:
PD model: 115 kg (253.53 lb)
PN/PR model: 111 kg (244.71 lb)
Maximum unpacked weight:
PD model: 111 kg (244.71 lb)
PN/PR model: 107 kg (235.89 lb)
IMPORTANT: Position the washer so that the rear of the washer
is within approximately 900 mm (3 ft) of its final location.
There are 4 shipping bolts in the rear panel of the washer that
support the suspension system during transportation.
1. Keep the washer in the upright position while removing the
shipping bolts.
Shipping bolt
Shipping bolt with plastic spacer
2. Using a 13 mm (1/2") wrench, loosen each of the bolts.
3. Once the bolt is loose, move it to the center of the hole and
completely pull out the bolt, including the plastic spacer
covering the bolt.
4. Once all 4 bolts are removed, discard the bolts and spacers.
Insure that the left opening hole of the rear panel is closed
with the attached cap.
5. Close the bolt holes with the 4 transport bolt hole plugs.
NOTE: If the washer is to be transported at a later date, call your
product distributor or installer. To avoid suspension and structural
damage, your washer must be properly set up for relocation by a
trained professional.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mhn33pnMhn33pr

Table of Contents