Installer Manual Fleck 3150 - NXT - Generalities
1.5.
Abbreviations used
Assy......................................................... Assembly
BLFC ....................................................... Brine Line Flow Controller
BV ............................................................ Brine Valve
DF............................................................ Down Flow
DLFC ....................................................... Drain Line Flow Controller
HW........................................................... Hot Water
Inj ............................................................ Injector
QC............................................................ Quick Connect
Regen ...................................................... Regeneration
S&S ......................................................... Seals & Spacers
SBV.......................................................... Safety Brine Valve
SM ........................................................... Side mounted
TC ............................................................ Time Clock
TM ........................................................... Top mounted
UF............................................................ Up Flow
1.6.
Norms
1.6.1. Applicable norms
Comply with the following guidelines:
•
2006/42/EC: Machinery Directive;
•
2014/35/UE: Low Voltage Directive;
•
2014/30/UE: Electromagnetic compatibility;
•
2011/65/UE: Restriction of use of certain hazardous substances in electrical and electronic
equipment (RoHS);
•
UNI EN ISO9001 (certificate no. 95.022 SSG ICS).
Meets the following technical standards:
•
EN 55014-1;
•
EN 55014-2;
•
EN 61000-6-1;
•
EN 61000-6-2;
•
EN 61000-6-3;
•
EN 61000-6-4;
•
EN 61010-1.
1.6.2. Available certificates
•
CE;
•
DM174;
•
ACS.
8 / 122
Access to all certifications:
Ref. MKT-IM-010 / B - 28.05.2018