6.5.16. Regeneration days override

Set the maximum number of days that the valve is in service without regenerating, regardless from
the volume of water used.
Note
For a timeclock valve, this value must be set as regeneration period in days. For metered
valves, it is regenerated once the amount of days is reached at a preset time unless the
meter triggers regeneration before. Calendar override initiate regeneration only if no
regeneration has been initiated within the delay programmed in calendar override
parameter.
AL Adjust the number of days with
AM Press
to validate the selection and advance to the next
parameter.
→ Can be adjusted from:
1 to 99 days for timeclock regeneration;
OFF to 99 days for metered regeneration.

6.5.17. Regeneration start time

Set the time for regeneration start.
Mandatory
It must be set when the valve is in timeclock mode or with a calendar override.
AN Adjust the time of regeneration with
AO Press
to validate the selection and advance to the next
parameter.

6.5.18. Programming regeneration cycle times

Set the cycle times of the regeneration.
Note
Five cycles can be set. The system displays the programming cycles. The display allows
setting of a specific time for each cycle. If a cycle is set to NO, the next cycles is not activated.
Note
The sequence of the regeneration cycles depends upon regenerant flow, see 3.4. System
regeneration cycle, page 18.
Ref. MKT-IM-010 / B - 28.05.2018
Installer Manual Fleck 3150 - NXT - Programming
,
and
.
,
and
.
Without calendar forcing
REGENERATION DAY
OVERRIDE:OFF
Forcing every 3 days
REGENERATION DAY
OVERRIDE:03DAYS
Regeneration at 2:00 am
REGENERATION
TIME
02:00HR