Pentair FLECK 3150 NXT Installer Manual page 59

Hide thumbs Also See for FLECK 3150 NXT:
Table of Contents

Advertisement

Parameter
TRIP POINT 3
1 to 3997
TRIP DELAY 3
REGENERATION
OFF to 99
DAY OVERRIDE
REGENERATION
00:00:00 to
TIME
23:59:59
CYCLE 1
04:00:00
CYCLE 2
04:00:00
CYCLE 3
04:00:00
CYCLE 4
04:00:00
CYCLE 5
04:00:00
AUXILIARY
RELAY
Disabled
AUX RELAY
00:00:00 to
OUTPUT START
18:00:00
AUX RELAY
00:00:00 to
OUTPUT END
18:00:00
CHEMICAL
PUMP
Disabled
CPO AUX RELAY
1 to 9'999
VOLUME
CPO AUX RELAY
00:00:00 to
TIME
02:00:00
Ref. MKT-IM-010 / B - 28.05.2018
Options
Definition
Second
30 to 99
(30 seconds default)
OFF to
OFF to
OFF to
OFF to
OFF to
Enabled
(Default)
Enabled
(Default)
Installer Manual Fleck 3150 - NXT - Programming
L/m
This screen will only display for system
14 and will only appear with the system
sized to 4 on the master controller
(Valve address #1).
Use the SHIFT button to move to the
left.
Days between regenerations for
Day
timeclock mode.
Regeneration time will not appear
unless regeneration day override or
timeclock is on.
Hour
This screen will only display when
Hour
cycle 4 is not OFF.
-
Not compatible with CPO AUX
activation.
Only displayed if auxiliary relay is
enabled in previous screen.
Hour
Auxiliary relay will only display if
chemical pump is OFF for system
types 6 & 7.
-
This screen will only display on the
lead (#1) unit for system types 6 & 7.
For all other system types, it will
display for all units.
Activate the relay output during a
L
service based upon the volume of
treated water. Relay is activated for a
set time after every set volume is
Hour
treated. Not compatible with aux. relay
activation.
Note
59 / 122

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents