Install A New Probe - Siemens ADVIA 2400 Operator's Manual

Chemistry system
Hide thumbs Also See for ADVIA 2400:
Table of Contents

Advertisement

Install a new probe

1. Slowly insert the new probe (
seated against terminal 1 (
2. Verify that the probe is correctly positioned in terminal 2 (
3. Tighten the setscrews while maintaining the probe position in terminal 2 and the joint
holder.
4. Finger-tighten the joint connector.
CAUTION
To avoid damaging the threads or introducing leaks or air bubbles, do not cross
thread or force the knurled fitting in too far.
5. Replace the probe-arm cover and tighten the two probe cover screws.
6. Lift up the probe arm to the end of its travel. Manually rotate the probe over the
probe wash cup but not within the wash port.
7. Put the system in Operating mode.
8. At the Menu Panel, select
area, select
All probes (DPP, SPP, RPP1, and RPP2) move over cuvettes.
9. Ensure that the probe is perpendicular to the arm and centered over the cuvette. If
not, call your local technical support provider or distributor.
146
) through the guide hole (
5
).
6
Figure 5-30. Installing new probe
, then select
Maint.
.
Position adjust start
) until the flange (
7
) and the joint holder
1
1)
Terminal 2
2)
Joint Holder
3)
Joint Connector
4)
Probe Tube
5)
Terminal 1
6)
Guide Hole
7)
Flange
In the Probe posi.adjust
User maint.
ADVIA 2400 Operator's Guide
) is
8
).
(2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents