12. Electrical Connections/Wiring Cont.
The path of the electric power supply wires
or cable of the boiler and the remote control
must follow the indicated path and be
fastened as shown in Figure 12.16.
12.9 Remote enabling operation with the external probe:
For the boiler, operation with the external
probe must be enabled.
Its operation can be enabled by programming
the REMOTE.
• Press the button for more than 3 seconds
to enter the mode
Press the buttons
time to access transparent programming
(Figure 12.18).
35 RIVA ADVANCE COMBI MANUAL
.
and
at the same
Figure 12.16
0
21
3
1
8
6
1 5
9
1
2
Figure 12.17
Figure 12.18