New Communications Module Installation
This installation procedure is for flowmeters with an I/O Module installed but no Modbus
Communications Module previously installed. Mounting kits are also required for this
installation.
Table 2- 1
1015N-5M-MK3
1. Disconnect power to the unit.
2. Open the flowmeter cover by releasing the side cover latch
3. Loosen the I/O Module cover captive screw
standoff.
①
②
③
Figure 2-1
4. Remove the four mounting screws and standoffs
discard.
5. Install the new standoffs supplied in the mounting kit in the vacant positions.
F US Clamp-on Communications Protocol Manual
Hardware Installation Manual, 11/2015, A5E34981613-AC
Mounting Kit
Mounting Kit
Flowmeter
I/O Module cover, cover screw,
standoff
Flowmeter Cover Latch
New Communications Module Installation
2.2 F US Clamp-on Communications Module Installation
Meter Type
1010MN
②
and remove the cover, screw and
④
Power Connector location
⑤
I/O Module
⑥
I/O Module captive mounting screws
⑥
Installing/Mounting
Meter Configuration
1010N-8M I/O Module with
1010N-2M Module installed
③
.
that secure the I/O Module
⑤
and
11