Invacare Robin Installation And Technical Manual page 19

Hide thumbs Also See for Robin:
Table of Contents

Advertisement

Removable suspended ceiling
In case of a removable suspended ceiling, the space above the suspended ceiling is accessible and pendle brackets
and rail can be installed at the same time.
1. Concrete ceiling.
2. Expansion bolts M8x75, 2 pcs.
3. Yoke (Steel plate for even installation surface), 1 pcs. 3mm.
4. M8 nuts, 4 pcs.
5. M8 coupling nuts, 2 pcs. (Collecting sleeve).
6. M8 locked nuts, 2 pcs.
7. Aluminium pipes Ø40, 2 pcs.
8. Ceiling bracket (standard), 1 pcs.
9. Removable suspended ceiling.
10. M8 threaded rods, 2 pcs.
11. Locking washers, 2 pcs. 11x35x2.
(A HKD anchor can be used as an alternative, which the rods are fixed directly into).
To get the right length of the pendling brackets, use the distance between the concrete ceiling and the lower face
of the suspended ceiling as your starting point.
This distance is used to determine the length of the pendle bracket pipe and the threaded rod. Their length must
equal the previously measured distance described above.
When installing, first install the yoke for the centre ceiling bracket. To do this, follow the instructions for the
installation directly in a concrete ceiling. In this case, however, the holes are drilled for both expansions bolts at
the same time.
When driving in the expansion bolts, leave approx. 15 mm protruding below the nut, so that you can screw the
coupling nut onto it to half its length. Counter-tighten the coupling nut against the expansion bolt nut.
Measure for the hole in a suspended ceiling and drill/cut this hole to Ø40 mm.
Attach a M8 nut onto the threaded rod (approx. 20 mm onto the rod) and screw the rod into the coupling nut
until it hits the expansion bolt and counter-tighten the nut.
After completion, push the two aluminium pipes into the holes and fasten the rail as described in the usual
instruction instructions.
Note! The distance between the suspended ceiling and the ceiling bracket must be min. 1-5 mm
to prevent damages to the false ceiling.
19

Advertisement

Table of Contents
loading

Table of Contents