Download Print this page

Remington 500 Series Operating Manual page 6

2-stage and 3-stage with/without steering trigger controls
Hide thumbs Also See for 500 Series:

Advertisement

Available languages

Available languages

3.
Place shift lever in Forward-6 position or
fastest forward speed (if equipped).
4.
Observe lower rear area of equipment
to be sure both cables (if equipped) are
aligned and seated properly in roller
guides. See Figure 2-3.
NOTE: On select units, chute-pitch control
cables will be routed under the engine on the
left side and will not use roller guides.
Figure 2-3
5.
Pivot handle upward and align the lower
handle. See Figure 2-4. Remove and
discard any rubber bands, if present.
They are for packaging purposes only.
Chute Assembly Options
Refer to Figure 2-7 and proceed to your applicable Chute Control Style on pages 7-11.
Chute
Standard Side Crank
Assembly
Rod Assembly
Standard Side Crank Chute Control
Page 7
(w/ Flex Shaft Steel Chute) Page 10
6
S
2 — A
ection
SSembly
NOTE: On select units with steel rod
speed selectors, you may need to lower
shift rod to the side slightly to maneuver
handle panel over it when pivoting
handle upward.
6.
Attach the two carriage screws (b)
and nuts (a) removed in Step 2. Finish
securing the handle by tightening the
top two nuts (c) loosened in Step 2. See
Figure 2-5 or Figure 2-6 for units with
side supports.
Chute
Assembly
(w/ Chute Control Rod) Page 8
Chute
Assembly
Flex
Shaft
Overhead Chute Control
& S
-U
et
p
Figure 2-4
Overhead Chute
Control Rod
Overhead Chute Control
Chute Control
Rods
Electric Chute Control
Pages 11
Figure 2-7
(c)
(b)
(c)
(a)
(a)
Figure 2-5
(c)
(b)
(c)
(a)
(a)
Figure 2-6
STOP
Refer to "Figure 2-7" on page 6 to identify your
applicable chute style and continue to Chute Assembly
Options (page 6).
Chute Control
Chute
Assembly
2-Way & 4-Way Chute Control
Page 9
Chute
Assembly
(b)
(b)
Rod

Advertisement

loading

This manual is also suitable for:

800 series600 series