Wiring; Processor Unit - Furuno FCV-2100 Installation Manual

Fish size indicator
Hide thumbs Also See for FCV-2100:
Table of Contents

Advertisement

2.

WIRING

2.1

Processor Unit

Use the specified cables to connect cables to the processor unit. When the connectors
are not used, connector protective caps should be left on the connectors.
FCV-2102
HUB-101
NETWORK
Not used
Trackball control unit
TCU-001
Note: Do not connect equipment other than the FCV-2102 or HUB-101 to the NET-
WORK port.
2.1.1
Power cable and grounding
Connect the power cable (MJ-A3SPF0017A-050ZC, 5 m, supplied) to 24VDC power.
Connect the ground wire (IV-2sq., local supply) between ground terminal and ship's
ground.
DVI-D/D S-LINK (option)
DVI-D1
To monitor
Not used
1.5m
CONT1/2
DVI-D/D S-LINK
(option)
DVI-D2
Ext. monitor (XGA only)
USB3
For maintenance
USB cable (local supply)
USB1/2
3COX-2P-6C
PHR-10/PHR-5-L2000 (supplied)
(local supply)
RGB
NMEA1/2/3
NAV equipment, Net sonde
Not used.
Do not remove the
protective cap.
GND
Ground to hull
MJ-A3SPF0017A-050ZC
(supplied)
24VDC
To power source (rectifier)
USB device
2-1

Advertisement

Table of Contents
loading

Table of Contents