Furuno FCV-2100 Installation Manual page 17

Fish size indicator
Hide thumbs Also See for FCV-2100:
Table of Contents

Advertisement

7. Set the gasket to the entrance of the connector cover.
Insert the gasket to the
entrance of cover so the slits in
the holes face downward.
8. Remove sticker only from the slots to be used on the fixing plate 2.
9. Attach the fixing plate 2 to the entrance of the connector cover.
10. Fasten the fixing metal to the connector cover with three binding screws.
11. Fix the cables to the cable clamp with cable ties (2 pcs. each).
Trackball control unit
Trackball control unit cable (5 m) is connected to CONT1 port or CONT2 port.
External monitor (XGA resolution only)
The FURUNO MU-150HD monitor, or equivalent XGA after-market monitor can be
connected as an external monitor. Connect the monitor to the correct port, depending
on whether the monitor has analog or digital output.
• Digital (DVI-D2 port): Use the DVI-D/D S-LINK cable (5/10 m, option)
• Analog (RGB port): Use the coax. cable 3COX-2P-6C cable (local supply)
NAV equipment
The NMEA1/2/3 ports are available to connect the navigational equipment. CIF sig-
nals are also available from menu setting. Use the supplied cable PHR-10/PHR-5-
L2000 (2m) for connecting.
The default settings of ports as follows
Remove sticker from the
slots to be used
Fix the cables with
cable ties
2. WIRING
2-3

Advertisement

Table of Contents
loading

Table of Contents