Preventative Maintenance Checklist (Facility Personnel); To Be Done Daily; To Be Done Weekly: All Of The Above Plus; To Be Done Monthly: All Of The Above Plus - Precor TRM10/GEN06 Service Manual

Treadmill base
Table of Contents

Advertisement

Preventative Maintenance Checklist (Facility personnel)

To Be Done Daily:

 Turn off and unplug the unit.
 Visually inspect the deck and belt.
 Wipe down the deck and belt with a dry cloth.
 All outer surfaces of the unit are clean
 Inspect the power cord.

To Be Done Weekly: All of the above plus

 Elevate the unit to maximum incline and remove power.
 Totally clean the environment around and under the machine.
 Re-connect power and turn the unit on.
 Perform the "Running Belt and Deck Cleaning Procedure"

To Be Done Monthly: All of the above plus

 Remove the power from the unit.
 Clean the outer surfaces of the unit, and scrub the top surface of the belt.
© Precor Incorporated, Unauthorized Reproduction and Distribution Prohibited by Law
(To be done by the facility personnel)
Page 133

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents