6.4

Input #1 Set Up Wiring

Thermocouple inputs
using an ice bath
1/01
Refer to Figure 6-2 and wire the controller according to the procedure
given in Table 6-3.
Table 6-3
Set Up Wiring Procedure for Thermocouple Inputs Using
An Ice Bath
Step
1
Connect the copper leads to the calibrator.
2
Connect a length of thermocouple extension wire to the end of each copper
lead and insert the junction points into the ice bath.
3
Connect the thermocouple extension wires to the terminals for Input #1. See
Figure 6-2.
4
Connect a cold junction resistor to terminals 25 and 27 for Input #1. See
Figure 6-2.
Figure 6-2
Wiring Connections for Thermocouple Inputs Using an Ice
Bath
T/C Extension Wire
UDC3300 Limit Controller Product Manual
Action
L1
L2/N
22
23
24
25
+
26
27
Copper Leads
Ice Bath
10
1
11
2
12
3
13
4
14
5
15
6
16
7
17
8
9
C/J Resistor
+
Millivolt
Source
24205
Continued on next page