Plc Multiple Connection; Gt Link Connection - Panasonic GT703 User Manual

Programmable display
Hide thumbs Also See for GT703:
Table of Contents

Advertisement

4.1 Connection with PLC

4.1.1 PLC Multiple Connection

PLC multiple connection function is a function that enables more than one PLCs to connect
with one GT using RS485 communication or Ethernet communication. For the RS485
communication, up to 31 PLCs can be connected. For the Ethernet communication, up to 64
PLCs can be connected. For details of the PLC multiple connection, refer to "GT series
Reference Manual".

4.1.2 GT Link Connection

GT link function is a function that enables more than one GT to connect with one PLC.
 Wiring of Power Supply
It takes more than 10 seconds for all GT units to be operable after turning on the power
supply of GT.
(The time varies according to conditions and the number of connected GT units.)
As for the power supply of GT, it is recommended to use the wiring that enables multiple GT
units to be simultaneously turned on.
If the power supplies of multiple GT units cannot be simultaneously turned on after turning on
the power supply of devices such as a PLC, an error message will be displayed and it may
take some time to make communication to be established.
(The error display disappears when all the GT units become operable.)
4-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt704Gt seriesGt704mGt703m

Table of Contents