7.
Set the ribbon shaft with the loaded ribbon take-up core on the take-up side of the
ribbon drive part.
In the same way as with the delivery side, insert the right part of the ribbon shaft along the
attachment guides and into the attachment hole while pressing the left part of the ribbon shaft
against the protruding part of the flange.
Flange on take-up side
Attachment hole in
left part of ribbon shaft
Protruding part
Ribbon shaft
attachment
guide on
take-up side
Ribbon shaft
attachment
hole on
take-up side
—
Protrusion of
right part of
ribbon shaft
41
—