Shutdown/Cleaning - Graco Tradeworks 150 Operation Manual

Project painter
Table of Contents

Advertisement

Warnings
SHUTDOWN AND CLEANING - WATER-BASED PAINTS*
1
150/170
Project Painter
Turn Power Switch OFF. Place suction tube and
drain tube into empty waste pail. Turn
Spray/Prime valve to PRIME to relieve fluid pres-
sure.
4
Unscrew inlet screen from suction tube. Thread
Power Flush attachment onto suction tube.
6
WASTE
Open
Trigger gun into waste pail for 1-2 minutes until
relatively clear water comes out of gun.
8
QUICK START-UP GUIDE
WARNING
WARNING
WARNING
2
With the trigger safety ON, remove tip and guard
from gun and place into waste pail for further
cleaning.
5
Project Painter
WASTE
Open
Trigger gun into paint pail and turn Spray/Prime valve to SPRAY. Turn Power Switch ON to
push paint in hose into paint pail. When water comes out of the gun, keep gun triggered and
move aim of gun into waste pail.
7
Project Painter
Turn Prime/Spray valve to PRIME. Let water flow through the sprayer and into waste pail for
20 seconds.
3
Thread Power Flush attachment onto gar-
den hose. Rinse paint off of suction tube,
drain tube and inlet screen.
150/170
150/170
WASTE
WASTE
PAINT
Open
WASTE
Open
313381L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents