Installing The Support Rails For A 2145 Ups-1U; Adjusting The Rail Depth On The 2145 Ups-1U - IBM 2145UPS-1U Hardware Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Figure 15. Installing the support rails for a 2145 UPS-1U into the rack
Figure 16. Adjusting the rail depth on the 2145 UPS-1U
42
IBM System Storage SAN Volume Controller: Hardware Installation Guide
4. Loosen the assembly wing nuts (
adjust the rail size to the depth of your rack.
Rear
3
1
Assembly wing nuts
2
Hold-down bracket
3
Wing nut
5. Position the rear, hold-down bracket (
rail assemblies and tighten the wing nut (
6. Select the holes in the rail where you want to position the 2145 UPS-1U.
Note: The bottom flange of the support rail must align with the EIA mark on
the rack.
7. Using two M6 × 10 screws (
2
, attach the rail to the rear of the rack. The customer's rack might be
different than the one shown here, and if so, might require different clip nuts
or fasteners.
1
1
in Figure 16) on both rail assemblies and
2
1
2
in Figure 16) towards the end of the
3
in Figure 16).
1
in Figure 17 on page 43) and two clip nuts
2
Front

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents