Installing The Cable Retention Bracket - Option A - IBM 2145UPS-1U Hardware Installation Manual

System storage san volume controller
Table of Contents

Advertisement

|
|

Installing the cable retention bracket - option A

|
|
|
|
|
|
|
|
|
|
|
56
IBM System Storage SAN Volume Controller: Hardware Installation Guide
The cable retention bracket attaches to the back of the SAN Volume Controller
2145-8G4 node. It is connected with the screws that already hold the rear plate of
the power supply in place.
Install the SAN Volume Controller 2145-8G4 cable retention bracket after you
install the node in the rack.
To attach the bracket to the rack rail, perform the following steps:
1. With the node powered off and the power cable removed, unscrew and remove
1
the two screws
supply fan unit, as shown in Figure 32 on page 57.
on the right side of the rear plate that covers the power

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents