Adjusting The Rail Depth On The 2145 Ups-1U; Securing The Rear Rail On The 2145 Ups-1U - IBM 2145UPS-1U Hardware Installation Manual

System storage san volume controller
Table of Contents

Advertisement

Rear
3
Figure 50. Adjusting the rail depth on the 2145 UPS-1U
1
Assembly wing nuts
2
Hold-down bracket
3
Wing nut
5. Position the rear, hold-down bracket (
rail assemblies and tighten the wing nut (
6. Select the holes in the rail where you want to position the 2145 UPS-1U.
Note: The bottom flange of the support rail must align with the EIA mark on
the rack.
7. Using two M6 × 10 screws (
rail to the rear of the rack. The customer's rack might be different than the
one shown here, and if so, might require different clip nuts or fasteners.
1
Figure 51. Securing the rear rail on the 2145 UPS-1U
8. Attach only the bottom hole of the rail to the front of the rack with one M6 ×
10 screw and one clip nut (
Appendix A. SAN Volume Controller 2145-8F4 and SAN Volume Controller 2145-8F2
2
1
2
in Figure 50) towards the end of the
3
in Figure 50).
1
in Figure 51) and two clip nuts
2
1
in Figure 52 on page 82).
Front
2
, attach the
81