Positioning Ram - Grizzly G0796 Owner's Manual

Vertical mill w/power feed & dro
Table of Contents

Advertisement

Rotating Head Left/Right
1.
DISCONNECT MACHINE FROM POWER!
2.
Loosen four lock bolts shown in Figure 29.
3.
Use one hand to apply pressure to head in
direction of rotation, then slowly turn rotation
bolt shown in Figure 29.
Note: Turn rotation bolt clockwise to rotate
head left and counterclockwise to rotate it
right.
Rotation Bolt
Figure 29. Head rotation controls.
Note: The lock bolts shown in Figure 29 are
threaded into T-nuts that travel in a circu-
lar slot during head rotation. When rotating
head, it is possible for these T-nuts to jam in
the slot preventing movement of head. If this
happens, gently rotate each lock bolt, start-
ing with the lower right, until you free up the
jammed T-nut. Then continue to rotate head
to desired position.
4.
Re-tighten lock bolts.
Always lock head firmly in place after tilt-
ing or rotating it. Unexpected movement of
head during operations could cause dam-
age to cutter or workpiece.
Model G0796/G0797 (Mfd. Since 1/18)
Lock Bolts

Positioning Ram

The ram rotates 360° around the turret, and
travels forward or backward 12" (G0796), or 18
(G0797).
Tool Needed
Wrench 19mm ................................................... 1
Rotating Ram
1.
DISCONNECT MACHINE FROM POWER!
2.
Loosen four lock bolts on top of turret (see
Figure 30).
Note: There are two lock bolts on each side
of the ram.
Rotation
Scale
Figure 30. Ram rotational controls.
Note: In the next step, take care not to entan-
gle or stretch electrical cabling as you move
ram around turret.
3.
Push head to manually rotate ram. Use rota-
tion scale to determine correct position for
your operation, then re-tighten four lock bolts
to secure ram in place.
"
1
2
Qty
Lock Bolts
(2 of 4)
-33-

Advertisement

Table of Contents
loading

This manual is also suitable for:

G0797

Table of Contents