Platform Rotator - Genie Z-40/23N Service And Repair Manual

Hide thumbs Also See for Z-40/23N:
Table of Contents

Advertisement

September 2016
How to Bleed the Slave Cylinder
1
Raise the primary boom to a horizontal
position.
2
Move the platform level toggle switch up and
down through two platform leveling cycles to
remove any air that might be in the system.
Part No. 1268528
2-2

Platform Rotator

How to Bleed the Platform
Rotator
Note: This procedure will require two people.
1
Move the function enable toggle switch to
either side and activate the platform rotate
toggle switch to the right and then to the left
through two platform rotation cycles. Then
hold the switch to the right position until the
platform is fully rotated to the right.
2
Place a suitable container underneath the
platform rotator.
3
Open the top bleed screw on the rotator, but
do not remove it.
4
Move the function enable toggle switch to
either side and hold the platform rotate toggle
switch to the left position until the platform is
fully rotated to the left. Continue holding the
toggle switch until air stops coming out of the
bleed screw. Close the bleed screw.
Z-40/23N, Z-40/23N RJ
Service and Repair Manual
Platform Components
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
Crushing hazard. Keep clear of
the platform during rotation.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-40/23n rj

Table of Contents