Hardware Installation; Wall Mounting - ZyXEL Communications GS1900-8 User Manual

Gbe smart managed switch. gs1900 series
Hide thumbs Also See for GS1900-8:
Table of Contents

Advertisement

2.2 Hardware Installation

See
Table 1 on page 15
Not e: Ask an aut horized t echnician t o at t ach t he Sw it ch t o t he rack/ wall.
Refer t o
Sect ion 2.2.2 on page 21
The Swit ch should have a m inim um 25 m m space aroun d it for vent ilat ion.
The Swit ch should be placed on a desk t hat ha s a level surface and t hat is able t o support t he
weight of t he Swit ch.
To st art using it , sim ply connect t he power cables and t urn on t he Swit ch.

2.2.1 Wall Mounting

Do t he following t o at t ach your Swit ch t o a wall.
See t he following t able for how far apart t o place t he screws.
Table 2 Dist ance bet ween t he cent ers of t he holes for wall m ount ing
GS1900-8
176 m m
Screw t he t wo screws provided wit h your Swit ch int o t he wall ( see t he figure in st ep 2) . Use screws
wit h 6 m m ~ 8 m m ( 0.24" ~ 0.31" ) wide heads. Do not screw t he screws all t he way in t o t he wall;
leave a sm all gap bet ween t he head of t he screw and t he wall.
The gap m ust be big enough for t he screw heads t o slide int o t he screw slot s and t he connect ion
cables t o run down t he back of t he Swit ch.
Not e: Make sure t he screws are securely fixed t o t he wall and st rong enough t o hold t he
weight of t he Swit ch wit h t he connect ion cables.
Align t he holes on t he back of t he Swit ch wit h t he screws on t he wall. Hang t he Swit ch on t he
screws.
Chapter 2 Hardware Installation and Connection
for a com parison of t he hardware inst allat ion m et hods of each m odel:
for rack- m ount ing inst ruct ions. Take not e of t he following:
GS1900-8HP
GS1900-10HP
176 m m
176 m m
GS1900 Series User's Guide
GS1900-16
GS1900-24E
148 m m
207 m m
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents