Lenovo ThinkSystem SR650 Maintenance Manual page 188

2u rack server
Hide thumbs Also See for ThinkSystem SR650:
Table of Contents

Advertisement

To Connect:
1. Turn OFF all power sources and equipment that is to
be attached to this product.
2. Attach signal cables to the product.
3. Attach power cords to the product.
• For ac systems, use appliance inlets.
• For dc systems, ensure correct polarity of -48 V dc
connections: RTN is + and -48 V dc is -. Earth
ground should use a two-hole lug for safety.
4. Attach signal cables to other devices.
5. Connect power cords to their sources.
6. Turn ON all the power sources.
Before installing a hot-swap power supply, touch the static-protective package that contains the new hot-
swap power supply to any unpainted surface on the outside of the server. Then, take the new hot-swap
power supply out of the package and place it on a static-protective surface.
To install a hot-swap power supply, complete the following steps:
Watch the procedure. A video of the installation process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-A25P7vBoGa_wn7D7XTgDS_
• Youku:
http://list.youku.com/albumlist/show/id_50483444
Step 1.
If the server is in a rack, adjust the cable management arm (CMA) to gain access to the power
supply bay.
If you have installed the 2U CMA Upgrade Kit for Toolless Slide Rail or Toolless Slide Rail Kit with
2U CMA, do the following:
180
ThinkSystem SR650 Maintenance Manual
To Disconnect:
1. Turn OFF all power sources and equipment that is to
be attached to this product.
• For ac systems, remove all power cords from the
chassis power receptacles or interrupt power at
the ac power distribution unit.
• For dc systems, disconnect dc power sources at
the breaker panel or by turning off the power
source. Then, remove the dc cables.
2. Remove the signal cables from the connectors.
3. Remove all cables from the devices.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents