ESIE16-02B
|
Part 3. Repair
2
10
1. Insulation
2. Main PCB
3. Electrical power wiring
4. Wire terminals
5. Screw
Installation
1.
Proceed in reverse order.
Page 72
RA R32 Split & multi split M-Series
Figure 3-7: Removing the switch box
1
9
3.3. Unit specific repair procedures
7
7
6. Wire clamp
7. Screw
8. Right side plate assembly
9. Cable tie
10. Switch box
4
6
5
3
8
7
4/04/17
|
Version 1.1