Replacing Switch Box - Daikin 2MXM50M Service Manual

Ra r32 split & multi split m-series. ftxj-m series;ftxm-m series;ftxp-kv series;fdxm-f series;rxj-m series; rxm-m series;mxm-m series;mxm-n series
Table of Contents

Advertisement

ESIE16-02B
|
Part 3. Repair

3.3.2.2. Replacing switch box

PRELIMINARY ACTIONS
1.
Switch off the Daikin unit via the user interface.
2.
Switch off the Daikin unit with the field supplied circuit breaker.
3.
Remove plate work when required, refer to
PROCEDURE
Removal
1.
Remove the insulation (1).
W
: R
ARNING
When reconnecting a connector to the PCB, do not apply force, as this may damage the connector or connector pins of
the PCB.
2.
Unplug all connectors from the main PCB (2), see
3.
Remove all electrical power wiring (3) from the wire terminals (4).
4.
Remove the screws (5) that fix the wire clamp (6), remove the wire clamp (6).
5.
Remove the screws (7) that fix the right side plate assembly (8).
6.
Cut the cable tie (9).
7.
Lift the switch box (10) from the Daikin unit.
4/04/17
|
Version 1.1
RA R32 Split & multi split M-Series
"Basic removal" on page
F
ISK OF
IRE
"Component checklist" on page
3.3. Unit specific repair procedures
68.
121.
Page 71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents