1
OBSERVATION
PORT
I89086-A
Complete assembly of the furnace according to the following list of activities as illustrated above:
(1) Installing the Observation Port
(2) Installing the Louvers
(3) Installing the Combustion Sleeve
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
NOTE: Corresponding procedures provided in order in this section.
Operator's Manual: Models Saturn™ 140 & Saturn™ 230
BURNER
MOUNTING
BRACKET
2
LOUVERS
Figure 3A - Overview of Furnace Assembly
"ALL THREAD" RODS
4
CONNECTOR
BLOCK
COMBUSTION SLEEVE
3
INSTALLED IN CHAMBER
ON 2" X 2" BLOCKS
3-2
4
5