Section 3: Furnace Assembly; Understanding Assembly; Required Tools And Materials - Saturn 125 Operator's Manual

Multi-oil furnace saturn 125-burner
Table of Contents

Advertisement

SECTION 3: FURNACE ASSEMBLY

Understanding Assembly

Assembling your Clean Burn Furnace includes the following steps:
(1) Installing the Observation Port
(2) Installing the Louvers
(3) Installing the Combustion Sleeve
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
Clean Burn recommends that you review all assembly procedures before proceeding, paying careful
attention to safety information statements.
Figure 3A on the following page provides a general overview of the furnace components and their
proper assembly.

Required Tools and Materials

The following tools are required for furnace assembly and should be gathered before starting any procedures:
9/16" open-end wrench
Medium flat-blade screwdriver
Medium adjustable wrench
1/4" nut driver attachment for drill
5/16" nut driver attachment for drill
Variable speed drill
Operator's Manual: Models Saturn™ 140 & Saturn™ 230
3-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

230140

Table of Contents