Carrier AquaEdge 19XR series Start-Up, Operation And Maintenance Instructions Manual page 155

Single-stage or two-stage semi-hermetic centrifugal liquid chillers with pic ii controls and hfc-134a 50/60 hz
Table of Contents

Advertisement

AUX
— Auxiliary
BR
— Bridge Rectifier
CB
— Circuit Breaker
CR
— Control Relay
COND
— Condenser
CPU
— Central Processing Unit
CVC/
Chiller Visual Controller
ICVC
CT
— Current Transformer
EVAP
— Evaporator
FU
— Fuse
GND
— Ground
NOTES:
LED status with power applied and prior to run command.
1
Transformer T1 primary fuses FU1/FU2 value dependent on system voltage and model, per Chart 1.
2
Transformer connections per transformer nameplate connection diagram.
MOVs are used on power stack assemblies for system voltages of 200 through 460 vac (as shown).
Resistor/capacitor networks (DVDTs) are used on power stack assemblies in place of MOVs for a system
3
voltage of 575 vac (not shown).
K3 relay shown in deenergized state. K3 contact will close when power is supplied. K3 contact will open
4
on stop command or system fault.
CT1-CT3 are sized per Chart 2.
5
Optional.
6
Fig. 64 — Benshaw, Inc. Wye-Delta Unit Mounted Starter Wiring Schematic (Low Voltage) (cont)
LEGEND
HPR
High Pressure Relay
L
Main Supply Power
LL
Control Power Supply
M
Contactor
O/L
Overload Reset
PFCC
Power Factor
Correction Capacitor
RLA
Rated Load Amps
SCR
Silicone Controller Rectifier
ST
Shunt Trip
TB
Terminal Block
"ON"
"OFF"
Wire Node Symbol
may have terminal block
Benshaw supplied
terminal block
Terminal Strip
Power Connection
155
PC Board Terminals
Twisted Pair
Twisted Shielded Pair
Shield Wire
Field Wiring
a19-1874

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aquaedge 19xrv series

Table of Contents