Carrier AquaEdge 19XRV Installation Instructions Manual
Carrier AquaEdge 19XRV Installation Instructions Manual

Carrier AquaEdge 19XRV Installation Instructions Manual

Single-stage semi-hermetic centrifugal liquid chillers with pic iii controls and hfc-134a 50/60 hz

Advertisement

SAFETY CONSIDERATIONS

Centrifugal liquid chillers are designed to provide safe
and reliable service when operated within design specifi-
cations. When operating this equipment, use good judg-
ment and safety precautions to avoid damage to
equipment and property or injury to personnel.
Be sure you understand and follow the procedures and
safety precautions contained in the machine instruc-
tions, as well as those listed in this guide.
DANGER
Failure to follow these procedures will result in severe per-
sonal injury or death.
DO NOT VENT refrigerant relief devices within a build-
ing. Outlet from rupture disc or relief valve must be vented
outdoors in accordance with the latest edition of ANSI/
ASHRAE 15 (American National Standards Institute/
American Society of Heating, Refrigerating and Air-Con-
ditioning Engineers) Safety Code for Mechanical Refriger-
ation. The accumulation of refrigerant in an enclosed space
can displace oxygen and cause asphyxiation.
PROVIDE adequate ventilation in accordance with ANSI/
ASHRAE 15, especially for enclosed and low overhead
spaces. Inhalation of high concentrations of vapor is harm-
ful and may cause heart irregularities, unconsciousness, or
death. Intentional misuse can be fatal. Vapor is heavier than
air and reduces the amount of oxygen available for breath-
ing. Product causes eye and skin irritation. Decomposition
products are hazardous.
DO NOT USE OXYGEN to purge lines or to pressurize a
machine for any purpose. Oxygen gas reacts violently with
oil, grease, and other common substances.
DO NOT USE air to leak test. Use only refrigerant or dry
nitrogen.
NEVER EXCEED specified test pressures. VERIFY the
allowable test pressure by checking the instruction litera-
ture and the design pressures on the equipment nameplate.
DO NOT VALVE OFF any safety device.
BE SURE that all pressure relief devices are properly
installed and functioning before operating any machine.
RISK OF INJURY OR DEATH by electrocution. High
voltage is present on motor leads even though the motor is
not running when a VFD (variable frequency drive) is
used. Open the power supply disconnect before touching
motor leads or terminals.
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53190042-01

Installation Instructions

Printed in U.S.A.
Form 19XRV-CLT-5SI
Semi-Hermetic Centrifugal Liquid Chillers
with PIC III Controls and HFC-134a
WARNING
Failure to follow these procedures may result in personal
injury or death.
DO NOT USE TORCH to remove any component. System
contains oil and refrigerant under pressure.
To remove a component, wear protective gloves and gog-
gles and proceed as follows:
a. Shut off electrical power to unit.
b. Recover refrigerant to relieve all pressure from sys-
tem using both high-pressure and low-pressure ports.
c. Traces of vapor should be displaced with nitrogen
and the work area should be well ventilated. Refrig-
erant in contact with an open flame produces toxic
gases.
d. Cut component connection tubing with tubing cutter
and remove component from unit. Use a pan to catch
any oil that may come out of the lines and as a gage
for how much oil to add to the system.
e. Carefully unsweat remaining tubing stubs when nec-
essary. Oil can ignite when exposed to torch flame.
DO NOT USE eyebolts or eyebolt holes to rig machine
sections or the entire assembly.
DO NOT work on high-voltage equipment unless you are a
qualified electrician.
DO NOT WORK ON electrical components, including
control panels, switches, VFD, or oil heater until you are
sure ALL POWER IS OFF and no residual voltage can
leak from capacitors or solid-state components.
LOCK OPEN AND TAG electrical circuits during servic-
ing. IF WORK IS INTERRUPTED, confirm that all cir-
cuits are de-energized before resuming work.
AVOID SPILLING liquid refrigerant on skin or getting it
into the eyes. USE SAFETY GOGGLES. Wash any spills
from the skin with soap and water. If liquid refrigerant
enters the eyes, IMMEDIATELY FLUSH EYES with
water and consult a physician.
NEVER APPLY an open flame or live steam to a refriger-
ant cylinder. Dangerous overpressure can result. When it is
necessary to heat refrigerant, use only warm (110 F [43 C])
water.
DO NOT REUSE disposable (nonreturnable) cylinders or
attempt to refill them. It is DANGEROUS AND ILLE-
GAL. When cylinder is emptied, evacuate remaining gas
pressure, loosen the collar, and unscrew and discard the
valve stem. DO NOT INCINERATE.
CHECK THE REFRIGERANT TYPE before adding
refrigerant to the machine. The introduction of the wrong
refrigerant can cause machine damage or malfunction.
(Warnings continued on next page.)
Pg 1
AquaEdge
19XRV
Single-Stage
50/60 Hz
12-16
Replaces: 19XRV-CLT-4SI
®

Advertisement

Table of Contents
loading

Summary of Contents for Carrier AquaEdge 19XRV

  • Page 1: Safety Considerations

    ® AquaEdge 19XRV Single-Stage Semi-Hermetic Centrifugal Liquid Chillers with PIC III Controls and HFC-134a 50/60 Hz Installation Instructions SAFETY CONSIDERATIONS WARNING Centrifugal liquid chillers are designed to provide safe and reliable service when operated within design specifi- Failure to follow these procedures may result in personal cations.
  • Page 2: Table Of Contents

    The 19XRV machine is factory assembled, General — pumps. Shut off the machine or pump before servicing wired, and leak tested. Installation (not by Carrier) consists equipment. primarily of establishing water and electrical services to the machine. The rigging, installation, field wiring, field piping,...
  • Page 3: Installation

    2. Check all items against shipping list. Immediately notify ommended minimum size wire to connect I/O signals to the the nearest Carrier representative if any item is missing. control terminal blocks is 18 AWG (American Wire Gage). 3. To prevent loss or damage, leave all parts in original Recommended terminal tightening torque is 7 to 9 in.-lb...
  • Page 4: Step 2 - Rig The Machine

    NOTE: Carrier suggests that a structural engineer be consulted if transmission of vibrations from mechanical equipment is of RIG MACHINE ASSEMBLY — See rigging instructions on concern.
  • Page 5 19XR 51 3 – T* 64 Description 19XR– — High Efficiency Semi-Hermetic Special Order Indicator Centrifugal Liquid Chiller – — Standard S — Special Order 19XRV — High Efficiency Semi-Hermetic Centrifugal Liquid Chiller with Unit-Mounted VFD Motor Voltage Code Code Volts-Phase-Hertz Cooler Size†...
  • Page 6 LEGEND 1 — Guide Vane Actuator 2 — Suction Elbow 3 — International Chiller Visual Control (ICVC) 4 — Chiller Identification Nameplate 5 — Cooler Auto Reset Relief Valves 6 — Cooler Pressure Transducer 7 — Condenser In/Out Temperature Thermistors 8 —...
  • Page 7: Frame

    FRAME 2-4 COMPRESSOR 3'-0" (915 mm) CLEARANCE FOR MOTOR SERVICE RECOMMENDED OVERHEAD SERVICE CLEARANCE TUBE REMOVAL CLEARANCE FRAME 5 COMPRESSOR 5'-0" (1524 mm) SPACE FOR 4'-0"- (1219 mm) RECOMMENDED OVERHEAD SERVICE CLEARANCE EITHER END 10'-0" (3048 mm) (SIZES 20-22) 12'-3 1/2" (3747 mm) (SIZES 30-32, 40-42, 50-54, 5A-5C, 5K-5R, 60-64, 6K-6R)
  • Page 8: Frame

    Table 2 — 19XRV Dimensions (Marine Waterbox) A (LENGTH, MARINE WATERBOX) B WIDTH C HEIGHT HEAT EXCHANGER 2-PASS* 1 OR 3-PASS† SIZE FT-IN. FT-IN. FT-IN. 20 TO 22 12- 5 3797 14- 1 4299 6- 1 1856 30 TO 32 14- 9 4496 16- 4...
  • Page 9: Frame

    MAXIMUM CHAIN LENGTH VESSEL COMP HEAT MACHINE DIM. “A” DIM. “B” DIM. “C” LENGTH FRAME EXCH “D” “E” “F” WEIGHT SIZE SIZE FT-IN. FT-IN. FT-IN. FT-IN. FT-IN. FT-IN. 20-22 22,910 10 392 3048 4- 7 1397 12-7 3835 13-0 3962 13-0 3962 30-32...
  • Page 10: Frame

    MAXIMUM CHAIN LENGTH VESSEL COMP HEAT MACHINE DIM. “A” DIM. “B” DIM. “C” LENGTH FRAME EXCH “D” “E” “F” WEIGHT SIZE SIZE FT-IN. FT-IN. FT-IN. FT-IN. FT-IN. FT-IN. 70-74 49,949 22 656 4267 6- 5 1956 1143 1448 9- 8 2946 11-6 3505...
  • Page 11: Rig Machine Components

    RIG MACHINE COMPONENTS — Refer to instructions 2. Using an overhead or portable hoist (minimum 2 ton rat- below to disassemble a chiller with an LF2 442A or 608A ed capacity), attach a free-fall chain to the sling secured to VFD or Standard Tier VFD (230, 335, 445, 485, 550, 605, the drive.
  • Page 12: Frame

    6. Disconnect all wires and cables that cross from the cooler g. compressor oil discharge pressure cable (Fig. 11, side of the machine to the condenser side, including: Item 5) a. temperature sensor cable at the waterbox (Fig. 10, h. guide vane actuator cable (Fig. 9, Item 1) Item 5) i.
  • Page 13 COMPRESSOR (SEE FIG. 11) a19-1700 1 — Compressor Suction Elbow (Unbolt) 6 — Motor Cooling Drain Line (Unbolt) 2 — Motor Cooling Line (Cut) 7 — Compressor Mounting Bolt (Unbolt — 4 Places) 3 — Motor Terminal Box (Unbolt) 8 — Cooler Liquid Feed Line (Unbolt) 4 —...
  • Page 14: Frame

    1 — Guide Vane Actuator Cables 2 — Diffuser Actuator (Frame 5 Compressor, Frame 4 Optional) 3 — Hot Gas Bypass Line (Optional) 4 — Condenser Leaving Water Pressure Cable (Optional) 5 — Condenser Leaving Water Temperature Cable 6 — Condenser Entering Water Temperature Cable 7 —...
  • Page 15: Frame

    (compressor weight column), stator, rotor, not included. Applicable to standard compressors only. For high and end bell cover weights. lift compressors, contact Carrier Chiller Marketing for weights. † See Model Number Nomenclature in Fig. 2. †† Stator weight includes the stator and shell.
  • Page 16: Frame

    (compressor weight column), stator, rotor, not included. Applicable to standard compressors only. For high and end bell cover weights. lift compressors, contact Carrier Chiller Marketing for weights. † See Model Number Nomenclature in Fig. 2. †† Stator weight includes the stator and shell.
  • Page 17: Frame

    (compressor weight column), stator, rotor, not included. Applicable to standard compressors only. For high and end bell cover weights. lift compressors, contact Carrier Chiller Marketing for weights. † See Model Number Nomenclature in Fig. 2. †† Stator weight includes the stator and shell.
  • Page 18: Frame

    (compressor weight column), stator, rotor, and end bell included. Applicable to standard compressors only. For high lift com- cover weights. pressors, contact Carrier Chiller Marketing for weights. For compres- † See Model Number Nomenclature in Fig. 2. sor frame size 4, two compressor weights are shown. The second value, 4211 lb (1910 kg), represents the weight when the compressor is equipped with a split ring diffuser (SRD).
  • Page 19: Frame

    (compressor weight column), stator, rotor, not included. Applicable to standard compressors only. For high and end bell cover weights. lift compressors, contact Carrier Chiller Marketing for weights. † See Model Number Nomenclature in Fig. 2. For compressor frame size 4, two compressor weights are shown.
  • Page 20: Frame

    (compressor weight column), stator, rotor, not included. Applicable to standard compressors only. For high and end bell cover weights. lift compressors, contact Carrier Chiller Marketing for weights. † See Model Number Nomenclature in Fig. 2. †† Stator weight includes the stator and shell.
  • Page 21: Frame

    (compressor weight column), stator, rotor, not included. Applicable to standard compressors only. For high and end bell cover weights. lift compressors, contact Carrier Chiller Marketing for weights. † See Model Number Nomenclature in Fig. 2. †† Stator weight includes the stator and shell.
  • Page 22: Frame

    Table 5 — 19XRV Component Weights FRAME 2 FRAME 3 FRAME 4 FRAME 5 COMPRESSOR* COMPRESSOR* COMPRESSOR* COMPRESSOR* COMPONENT SUCTION ELBOW DISCHARGE ELBOW CONTROL PANEL† OPTIONAL COOLER INLET ISOLATION VALVE OPTIONAL DISCHARGE ISOLATION VALVE STD TIER VFD — 380, 400, AND 460-V —...
  • Page 23 Table 6A — 19XRV Heat Exchanger Data — Drive End Entering Cooler Water ENGLISH METRIC (SI) DRY RIGGING DRY RIGGING WEIGHT MACHINE CHARGE WEIGHT MACHINE CHARGE CODE (LB)* (KG)* REFRIGERANT WATER WEIGHT REFRIGERANT WATER WEIGHT COOLER CONDENSER COOLER CONDENSER WEIGHT (LB) (LB) WEIGHT (KG) (KG)
  • Page 24 Table 6A — 19XRV Heat Exchanger Data — Drive End Entering Cooler Water (cont) ENGLISH METRIC (SI) DRY RIGGING DRY RIGGING WEIGHT MACHINE CHARGE WEIGHT MACHINE CHARGE CODE (LB)* (KG)* REFRIGERANT WATER WEIGHT REFRIGERANT WATER WEIGHT COOLER CONDENSER COOLER CONDENSER WEIGHT (LB) (LB) WEIGHT (KG)
  • Page 25 Table 6B — 19XRV Heat Exchanger Data — Compressor End Entering Cooler Water ENGLISH METRIC (SI) DRY RIGGING DRY RIGGING WEIGHT MACHINE CHARGE WEIGHT MACHINE CHARGE CODE (LB)* (KG)* REFRIGERANT WATER WEIGHT REFRIGERANT WATER WEIGHT COOLER CONDENSER COOLER CONDENSER WEIGHT (LB) (LB) WEIGHT (KG) (KG)
  • Page 26 Table 6B — 19XRV Heat Exchanger Data — Compressor End Entering Cooler Water (cont) ENGLISH METRIC (SI) DRY RIGGING WEIGHT DRY RIGGING WEIGHT MACHINE CHARGE MACHINE CHARGE (LB)* (KG)* CODE REFRIGERANT WATER WEIGHT REFRIGERANT WATER WEIGHT COOLER CONDENSER COOLER CONDENSER WEIGHT (LB) (LB) WEIGHT (KG)
  • Page 27: Frame

    Table 7 — 19XRV Additional Data for Marine Waterboxes* ENGLISH HEAT EXCHANGER RIGGING WEIGHT (LB) WATER VOLUME (GAL) RIGGING WEIGHT (KG) WATER VOLUME (L) FRAME, PASS PSIG COOLER CONDENSER COOLER CONDENSER COOLER CONDENSER COOLER CONDENSER FRAME 2, 1 AND 3 PASS —...
  • Page 28 Table 8A — 19XRV Waterbox Cover Weights — English (lb COOLER FRAME 2 FRAME 3 WATERBOX DESCRIPTION STANDARD STANDARD FLANGED FLANGED NOZZLES NOZZLES NIH, 1 Pass Cover, 150 psig NIH, 2 Pass Cover, 150 psig NIH, 3 Pass Cover, 150 psig MWB End Cover, 150 psig NIH/MWB Return Cover, 150 psig NIH, 1 Pass Cover, 300 psig...
  • Page 29 Table 8A — 19XRV Waterbox Cover Weights — English (lb) (cont) COOLER FRAME 4 FRAME 5 FRAME 6 WATERBOX DESCRIPTION STANDARD STANDARD STANDARD FLANGED FLANGED FLANGED NOZZLES NOZZLES NOZZLES NIH, 1 Pass Cover, 150 psig NIH, 2 Pass Cover, 150 psig NIH, 3 Pass Cover, 150 psig MWB End Cover, 150 psig MWB Return Cover, 150 psig...
  • Page 30 Table 8A — 19XRV Waterbox Cover Weights — English (lb) (cont) COOLER FRAME 7 FRAME 8 WATERBOX DESCRIPTION STANDARD STANDARD FLANGED FLANGED NOZZLES NOZZLES NIH, 1 Pass Cover, 150 psig NIH, 2 Pass Cover, 150 psig NIH, 3 Pass Cover, 150 psig 1250 1291 1629...
  • Page 31 Table 8B — 19XRV Waterbox Cover Weights — SI (kg) COOLER FRAME 2 FRAME 3 WATERBOX DESCRIPTION STANDARD STANDARD FLANGED FLANGED NOZZLES NOZZLES NIH, 1 Pass Cover, 1034 kPa NIH, 2 Pass Cover, 1034 kPa NIH, 3 Pass Cover, 1034 kPa MWB End Cover, 1034 kPa MWB Return Cover, 1034 kPa NIH, 1 Pass Cover, 2068 kPa...
  • Page 32 Table 8B — 19XRV Waterbox Cover Weights — SI (kg) (cont) COOLER FRAME 4 FRAME 5 FRAME 6 WATERBOX DESCRIPTION STANDARD STANDARD STANDARD FLANGED FLANGED FLANGED NOZZLES NOZZLES NOZZLES NIH, 1 Pass Cover, 1034 kPa NIH, 2 Pass Cover, 1034 kPa NIH, 3 Pass Cover, 1034 kPa MWB End Cover, 1034 kPa NIH/MWB Return Cover, 1034 kPa...
  • Page 33 Table 8B — 19XRV Waterbox Cover Weights — SI (kg) (cont) COOLER FRAME 7 FRAME 8 WATERBOX DESCRIPTION STANDARD STANDARD FLANGED FLANGED NOZZLES NOZZLES NIH, 1 Pass Cover, 1034 kPa NIH, 2 Pass Cover, 1034 kPa NIH, 3 Pass Cover, 1034 kPa MWB End Cover, 1034 kPa NIH/MWB Return Cover, 1034 kPa NIH, 1 Pass Cover, 2068 kPa...
  • Page 34 Special Instructions to Disassemble a Chiller with a 900A 3. Remove the terminal box transition piece. See Fig. 15. or 1200A LF2 VFD or Standard Tier VFD (765, 855, 960, 4. Label and disconnect the motor leads from the motor or 1070, 1275, 1530A) VFD terminals (Fig.
  • Page 35 VFD REFRIGERANT DRAIN ISOLATION VALVE VFD COOLING SOLENOID VALVE CONDENSER VFD REFRIGERANT STRAINER COOLER FILTER/DRIER SCHRADER VALVE MOTOR COOLING FILTER/DRIER SIGHT GLASS ISOLATION a19-1702 VALVES Fig. 13 — 900A or 1200A LF2 VFD or Standard Tier VFD (765, 855, 960, 1070, 1275, 1530A) Isolation Valves —...
  • Page 36 TERMINAL BOX ENCLOSURE TRANSITION PIECE COMPRESSOR MOTOR HOUSING CONDENSER COOLER a19-1704 Fig. 15 — 900A or 1200A LF2 VFD or Standard Tier VFD (765, 855, 960, 1070, 1275, 1530A) Motor Terminal Box Transition Piece — Typical...
  • Page 37 OPTIONAL LOCATION FOR GROUND CABLE COMPRESSOR MOTOR HOUSING MOTOR TERMINALS (6 PLACES) TERMINAL BOX FRAME TERMINAL BOX MOUNTING STUD (4 PLACES) DO NOT EXCEED 120 FT-LB TORQUE GROUND CABLE a19-1705 EXTERNAL VIEW FOAM INSULATION INSULATION FRAME THERMAL ASSEMBLY INSULATOR TERMINAL BOX FRAME GROUND CABLE NUT —...
  • Page 38 BUS BAR INSULATOR BUS BAR ORIENT POWER CABLE CONNECTORS TO ESTABLISH MAXIMUM AIR GAP BETWEEN TERMINALS AND SURROUNDING STRUCTURE GROUND LEAD MOTOR LEADS a19-1707 PHASE U, V, W (TYPICAL) GROUND Fig. 17 — VFD Motor Lead Installation (View Looking Down) PHASE U BUS BAR VFD POWER...
  • Page 39 1/2-13 IN. x 1.25 IN. LONG, GRADE 5 VFD LIFTING BRACKET BOLTS (10 PLACES) 45° MINIMUM VFD LIFTING BRACKETS a19-1710 Fig. 19 — 900A or 1200A VFD Enclosure Lifting Points LIFTING HOLES (4 PLACES) CONDENSER VFD SUPPORT SHELF ASSEMBLY VFD SUPPORT ASSEMBLY a19-1712 BOLTS (8 PLACES) Fig.
  • Page 40: Install Standard Isolation

    INSTALL SPRING ISOLATION — Spring isolation may motor-side end of the foam tubing, and push tubing the be purchased as an accessory from Carrier for field installation. rest of the way over the terminal and against the sheet It may also be field supplied and installed. Spring isolators may insulation on the motor side.
  • Page 41 a19-1547 DIMENSIONS 19XRV HEAT EXCHANGER SIZE FT-IN. FT-IN. FT-IN. FT-IN. FT-IN. FT-IN. 20-22 10- 7 3232 5- 4 1632 1- 3 30-32 12-10 3931 5- 5 1657 1- 3 35-37 14- 7 4451 5- 5 1657 1- 3 40-42 12-10 3931 6- 0 1829...
  • Page 42 NOTES: 1. Dimensions in ( ) are in millimeters. 2. Accessory (Carrier supplied, field installed) soleplate package includes 4 soleplates, 16 jacking screws and leveling pads. 3. Jacking screws to be removed after grout has set. 4. Thickness of grout will vary, depending on the amount necessary to level chiller. Use only pre-mixed non-shrinking grout, Ceilcote 748 or Chemrex Embeco 636 Plus Grout, 1½...
  • Page 43: Step 5 - Connect Piping

    for adjusting the piping in each plane and for periodic and Step 5 — Connect Piping major servicing of the equipment. INSTALL WATER PIPING TO HEAT EXCHANG- 5. Water flow direction must be as specified in Fig. 26-30. ERS — Refer to Table 9 for nozzle sizes. Install piping using job data, piping drawings, and procedures outlined below.
  • Page 44 Table 9 — 19XRV Waterbox Nozzle Sizes NOMINAL PIPE SIZE (IN.) ACTUAL PIPE ID (IN.) FRAME PRESSURE PASS SIZE PSIG (KPA) COOLER CONDENSER COOLER CONDENSER 10.020 10.020 150/300 7.981 7.981 (1034/2068) 6.065 6.065 10.020 10.020 150/300 7.981 7.981 (1034/2068) 6.065 6.065 10.020 10.020...
  • Page 45 NOZZLE-IN HEAD (NIH) WATERBOXES a19-1370 FRAMES 2 AND 3 a19-1243 FRAMES 4, 5, AND 6 NOZZLE ARRANGEMENT CODES FOR ALL 19XRV NOZZLE-IN-HEAD WATERBOXES CONDENSER WATERBOXES COOLER WATERBOXES PASS PASS ARRANGEMENT ARRANGEMENT CODE* CODE* *Refer to certified drawings. Fig. 27 — Piping Flow Data (NIH, Frames 2 Through 6)
  • Page 46 NOZZLE-IN HEAD (NIH) WATERBOXES COND COND COOLER COOLER COMPRESSOR END DRIVE END a19-1548 FRAMES 7 AND 8 NOZZLE ARRANGEMENT CODES FOR ALL 19XRV NOZZLE-IN-HEAD WATERBOXES COOLER WATERBOXES CONDENSER WATERBOXES PASS PASS ARRANGEMENT ARRANGEMENT CODE* CODE* *Refer to certified drawings. Fig. 28 — Piping Flow Data (NIH, Frames 7 and 8) MARINE WATERBOXES (MWB) FRAMES 2 AND 3 a19-1245...
  • Page 47 MARINE WATERBOXES (MWB) a19-1246 FRAMES 4, 5, AND 6 NOZZLE ARRANGEMENT CODES COOLER WATERBOXES CONDENSER WATERBOXES PASS ARRANGEMENT ARRANGEMENT CODE CODE — — — — — — — — — — — — a19-1247 FRAMES 7 AND 8 NOZZLE ARRANGEMENT CODES COOLER WATERBOXES CONDENSER WATERBOXES PASS...
  • Page 48 3/8" MALE FLARE RELIEF VALVE CONN. LEVEL GAGE 0' - 9 " 1/2" DIA. K.O. [229mm] ELECTRICAL CONN. TYPICAL (PUMPOUT POWER) 0' - 5 1/2" [140mm] (2) 1" NPT RELIEF VALVE OUTLET (SEE FIELD PRESSURE GAGE INSTALLATION NOTES) 1' - 7 " [483mm] 0' - 5 7/8 "...
  • Page 49 RATED DRY WEIGHT AND REFRIGERANT CAPACITY ENGLISH (lb) MAXIMUM REFRIGERANT CAPACITY (LB) TANK TANK OD WEIGHT* SIZE (IN.) ANSI/ASHRAE 15 UL 1963 (LB) 0428 24.00 2334 1860 1716 0452 27.25 3414 3563 3286 SI (kg) MAXIMUM REFRIGERANT CAPACITY (KG) TANK TANK OD WEIGHT* SIZE...
  • Page 50: Install Vent Piping To Relief Valves

    REFRIGERANT CHARGING VALVE CHILLER CONDENSER VESSEL CHILLER COOLER VESSEL COOLER REFRIGERANT REFRIGERANT CHARGING PRESSURE ISOLATION LIQUID LINE VALVE RELIEF SAFETY VALVE SERVICE VALVE VALVE SEPARATOR PUMPOUT CONDENSER PUMPOUT SERVICE VALVE ON SERVICE VALVE ON COMPRESSOR CHILLER PUMPOUT UNIT PUMPOUT CONDENSER WATER SUPPLY AND RETURN a19-1691...
  • Page 51 COOLER RELIEF VALVE ARRANGEMENT WITH OPTIONAL ISOLATION OF DISCHARGE AND COOLER (Fig. A, B) COOLER COOLER a19-1693 a19-1692 FIG. B FIG. A COOLER RELIEF VALVE ARRANGEMENT WITHOUT ISOLATION OPTION OF DISCHARGE AND COOLER (Fig. C, D) COOLER COOLER a19-1694 a19-1695 FIG.
  • Page 52: Install Circuit Breaker Handle

    VFD terminal strip. Additional spare sen- sors and Carrier Comfort Network modules may be specified ® Fig. 36 — Circuit Breaker Handle Extension as well.
  • Page 53 Table 10 — Relief Valve Locations QUANTITY OF RELIEF VALVES WITH DISCHARGE WITHOUT DISCHARGE FRAME RELIEF VALVE LOCATION SIZE OUTLET SIZE COOLER INLET COOLER INLET ISOLATION ISOLATION 1 NPT FEMALE CONNECTOR  NPT FEMALE CONNECTOR COOLER  NPT FEMALE CONNECTOR 1...
  • Page 54 TB3 − LF2 VFD FRAME 4 TB1 − LF2 VFD FRAME 3 GATE KILL † TB1 − LF2 VFD FRAME 4 * Located on A12 card, other terminals on field terminal strip. † Located on A33 card, other terminals on field terminal strip. ** Located on A22 card, other terminals on field terminal strip.
  • Page 55 a19-1714 Fig. 38 — 19XRV Field Wiring — LiquiFlow 2 VFD (cont)
  • Page 56 LEGEND FOR FIG. 38 REFERENCE DESCRIPTION NUMBER 3 Phase Under/Over Voltage Protection (Line Side) Phase Loss/Imbalance/Reversal Protection (Line Side) Frequency Shift Protection (Line Side) Overcurrent Protection (Line and Load Side) Phase to Ground Fault Protection (Line and Load Side) 3 Phase Amps (Chiller Display Line and Load Side) 3 Phase Volts (Chiller Display Line Side) 4-20mA kW Transducer Output (Line Side) From Chiller Control Module (CCM) kW Hours/Demand kW (Chiller Display Line Side)
  • Page 57 (devices To prevent damage to machine, do NOT punch holes or drill into not supplied by Carrier) must have 24 vac rating. Max current the top surface of the starter enclosure for field wiring. Knock- is 60 mA;...
  • Page 58 TB4-1 NOTE 3.6 a19-1950 Fig. 39 — 19XRV Field Wiring — Standard Tier VFD...
  • Page 59 a19-1951 Fig. 39 — 19XRV Field Wiring — Standard Tier VFD (cont)
  • Page 60 LEGEND FOR FIG. 39 REFERENCE EXPLANATION NUMBER 3 Phase Under/Over Voltage (Line Side) Phase Loss/Imbalance/Reversal (Line Side) Frequency Shift Protection (Line Side) Overcurrent Protection (Line and Load Side) Phase to Ground Fault Protection (Line and Load Side) 3 Phase Amps (Chiller Display Line and Load Side) 3 Phase Volts (Chiller Display Line Side) 4-20mA kW Transducer Output (Line Side) from Chiller Control Module (CCM) kW Hours/Demand kW (Chiller Display Line Side)
  • Page 61 (devices the top surface of the starter enclosure for field wiring. Knock- not supplied by Carrier) must have 24 vac rating. Max current outs are provided on the side of the starter enclosure for field is 60 mA;...
  • Page 62 a19-2001...
  • Page 63: Connect Vfd

    • 4 to 20 mA Resets 7 — Chilled Water Pump • Optional Remote Sensors 4. IMPORTANT: Carrier suggests that a structural engineer be consulted if trans- 8 — Condenser Water Pump mission of vibrations from mechanical equipment is of concern.
  • Page 64: Carrier Comfort Network ® Interface

    Voltage to terminals LL1 and LL2 (of each circuit) comes When connecting the CCN communication bus to a system from a control transformer in a starter built to Carrier speci- element, a color code system for the entire network is recom- fications.
  • Page 65 a19-1656...
  • Page 66: Lead/Lag Control Wiring

    3. Connect the communications wiring to the BAS port’s To order a BT485 terminator, consult Commercial Products screw terminals labeled Net +, Net -, and Shield. i-Vu ® Open Control System Master Prices. NOTE: Use the same polarity throughout the network MS/TP WIRING RECOMMENDATIONS —...
  • Page 67 Fig. 46 — Network Wiring Fig. 47 — BT485 Terminator Installation...
  • Page 68 Table 12 — MS/TP Wiring Recommendations SPECIFICATION RECOMMENDATION CABLE Single twisted pair, low capacitance, CL2P, 22 AWG (7x30), TC foam FEP, plenum-rated cable CONDUCTOR 22 or 24 AWG stranded copper (tin plated) INSULATION Foamed FEP 0.015 in. (0.381 mm) wall 0.060 in. (1.524 mm) OD COLOR CODE Black/White TWIST LAY...
  • Page 69 a19-1717...
  • Page 70 a19-1655...
  • Page 71: Step 7 - Install Field Insulation

    • cooler tube sheets Step 7 — Install Field Insulation • suction piping • motor cooling drain CAUTION • oil reclaim piping • oil cooler refrigerant side tubing Protect insulation from weld heat damage and weld splat- • refrigerant liquid line to cooler ter.
  • Page 74 © Carrier Corporation 2016 Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Catalog No. 04-53190042-01 Printed in U.S.A. Form 19XRV-CLT-5SI Pg 74 12-16 Replaces: 19XRV-CLT-4SI...
  • Page 75: Checklist

    Power wiring to VFD circuit breaker. (If chiller was disassembled during installation, motor leads must not be taped until the Carrier technician megger tests the motor.) b. Oil pump wiring c. Oil heater/control wiring d.
  • Page 76 Concerns about the installation/request for additional assistance: I am aware that the start-up time for a Carrier chiller can take between 2 and 6 days depending on the model of the machine and the options and accessories used with it.

Table of Contents