Sign In
Upload
Manuals
Brands
Carrier Manuals
Air Conditioner
AquaEdge 19XR series
Carrier AquaEdge 19XR series Manuals
Manuals and User Guides for Carrier AquaEdge 19XR series. We have
3
Carrier AquaEdge 19XR series manuals available for free PDF download: Start-Up, Operation And Maintenance Instructions Manual, Installation Instructions Manual
Carrier AquaEdge 19XR series Start-Up, Operation And Maintenance Instructions Manual (212 pages)
Single-Stage or Two-Stage Semi-Hermetic Centrifugal Liquid Chillers with PIC II Controls and HFC-134a 50/60 Hz
Brand:
Carrier
| Category:
Chiller
| Size: 17.58 MB
Table of Contents
Safety Considerations
1
Table of Contents
2
System Components
5
Introduction
5
Abbreviations and Explanations
5
Chiller Familiarization
5
Chiller Information Nameplate
5
Cooler
7
Condenser
7
Motor-Compressor
7
Control Panel
7
Economizer (Optional)
7
Factory-Mounted Starter or Variable
7
Frequency Drive (Optional)
7
Storage Vessel (Optional)
7
Refrigeration Cycle
10
Motor and Oil Cooling Cycle
11
Vfd Cooling Cycle
12
Lubrication Cycle
12
Summary
12
Details
12
Bearings
14
Oil Reclaim System
14
Primary Oil Recovery Mode
14
Secondary Oil Recovery Method
15
Optional
15
Starting Equipment
15
Unit-Mounted Solid-State Starter
15
Unit-Mounted Wye-Delta Starter
16
(Optional)
16
Unit-Mounted VFD (Optional)
16
Controls
17
Definitions
17
Analog Signal
17
Discrete Signal
17
General
17
PIC II System Components
17
International Chiller Visual
18
Controller (ICVC)
18
Integrated Starter Module (Ism)
18
Chiller Control Module (CCM)
18
Oil Heater Contactor (1C)
18
Oil Pump Contactor (2C)
18
Hot Gas Bypass Contactor Relay (3C)
19
Control Transformers (T1, T2)
19
Chiller Control Module (CCM
19
Sensors
21
ICVC Operation and Menus
21
Modes
21
Alarms and Alerts
22
ICVC Menu Items
22
Basic ICVC Operations
22
To View Status
23
Override Operations
23
Time Schedule Operation
27
To View and Change Set Points
28
Service Operation
28
Alarms and Alerts
29
PIC II System Functions
43
Alarms and Alerts
43
ICVC Menu Items
43
Basic ICVC Operations
43
Flow Detection
43
Capacity Control
44
Fixed Speed Applications
44
Variable Speed (Vfd) Applications
44
Ecw Control Option
45
Control Point Deadband
45
Proportional Bands
45
Diffuser Control
46
Demand Limiting
47
Chiller Timers and Starts Counter
47
Occupancy Schedule
47
Safety Controls
48
Pump and Fan Control
48
Shunt Trip (Option)
48
Function Loss Trip
48
Default Screen Freeze
51
Ramp Loading
52
Rampdown
52
Capacity Override
52
High Discharge Temperature Control
52
Compressor Bearing Temperature
52
Oil Sump Temperature and Pump Control
52
Oil Cooler
54
Remote Start/Stop Controls
54
Spare Safety and Spare Temperature Inputs
54
Alarm (Trip) Output Contacts
54
Refrigerant Leak Detector
54
Kilowatt Output
54
Remote Reset of Alarms
54
Condenser Pump Control
54
Condenser Freeze Prevention
55
Evaporator Freeze Protection
55
Tower Fan Relay Low and High
55
Auto. Restart after Power Failure
55
Fast Power Source Transfers
56
Water/Brine Reset
56
Reset Type
56
Demand Limit Control Option
56
Surge Prevention - Constant Flow and
56
Variable Primary Flow (VPF)
56
Hot Gas Bypass (Optional) Algorithm
56
Surge Protection (Fixed Speed Chiller)
57
Surge Prevention Algorithm with VFD
57
Surge Protection (VFD Chiller)
58
VFD Start-Up Speed Control
58
Head Pressure Reference Output
58
Lead/Lag Control
59
Common Point Sensor Usage and
59
Chiller Communication Wiring
59
Lead/Lag Operation
59
Faulted Chiller Operation
61
Load Balancing
61
Auto. Restart after Power Failure
61
Ice Build Control
61
Ice Build Initiation
62
Start-Up/Recycle Operation
62
Temperature Control During Ice Build
62
Termination of Ice Build
62
Return to Non-Ice Build Operations
62
Attach to Network Device Control
62
Attaching to Other Ccn Modules
63
Service Operation
63
To Access the Service Screens
63
To Log out of Network Device
63
Time Broadcast Enable
63
Holiday Scheduling
64
Daylight Saving Time Configuration
64
Controls
64
Start-Up/Shutdown/Recycle
64
Sequence
64
Local Start-Up
64
Shutdown Sequence
66
Automatic Soft Stop Amps Threshold
66
Chilled Water Recycle Mode
66
Safety Shutdown
67
Before Initial Start-Up
67
Job Data Required
67
Equipment Required
67
Using the Optional Storage Tank
67
And Pumpout System
67
Remove Shipping Packaging
67
Open Oil Circuit Valves
67
Tighten All Gasketed Joints and
67
Guide Vane Shaft Packing
67
Leak Test Chiller
68
Standing Vacuum Test
71
Chiller Dehydration
71
Inspect Water Piping
71
Check Optional Pumpout Compressor
72
Water Piping
72
Check Relief Valves
72
Inspect Wiring
72
Carrier Comfort Network
72
Interface
72
Check Starter
73
Mechanical Starter
73
BENSHAW, INC. Redistart MX3
73
Vfd Starter
73
Oil Charge
73
Power up the Controls and
73
Check the Oil Heater
73
Software Version
73
Software Configuration
74
Input the Design Set Points
74
Input the Local Occupied Schedule
74
(Occpc01S)
74
Input Service Configurations
74
Password
74
Input Time and Date
74
Change ICVC Configuration if Necessary
74
To Change the Password
74
To Change the ICVC Display from English to Metric Units
74
VFD Field Setup and Verification
75
Label Locations
76
Drive Protection and Other Incoming Wiring
77
VFD CONTROL VERIFICATION (Non-Running)
78
VFD CONTROL VERIFICATION (Running)
78
Hand Calculate Surge Prevention
79
Configurations
80
Configure Diffuser Control if
81
Modify Equipment Configuration
81
Perform a Control Test
82
Guide Vane Actuator Calibration
83
Cooler and Condenser Pressure Trans
83
Ducer and Waterside Flow Device
83
High Altitude Locations
84
Initial Start-Up
86
Initial Start-Up
87
To Stop the Chiller
88
To Read Refrigerant Pressures
90
Chillers with Isolation Valves
91
Procedures
93
Leak Rate
94
Checking Guide Vane Linkage . . . . . . . . . . . . . . . . . . 94 APPENDIX A - ICVC PARAMETER INDEX . .179-185
95
Trim Refrigerant Charge
95
Oil Specification
96
Maintenance
97
Inspect the Starting Equipment
98
Troubleshooting Guide
99
Troubleshooting Guide
100
Voltage Drop
104
Voltage Drop
105
Voltage Drop
108
Voltage Drop
109
Voltage Drop
110
Voltage Drop
112
Voltage Drop
114
Voltage Drop
115
Checking Pressure Transducers
116
Control Algorithms Checkout Procedure
117
Inputs
119
Replacing Defective Processor Modules
120
End of Life and Equipment Disposal
121
Appendix B — Lead/Lag Wiring
186
Appendix B — Lead/Lag Wiring
187
And Log Sheets
188
Appendix C - Maintenance Summary
188
Appendix D - Bacnet Communication
191
Option
191
Option
197
Index
198
Advertisement
Carrier AquaEdge 19XR series Start-Up, Operation And Maintenance Instructions Manual (128 pages)
Single Stage and Two-Stage Semi-Hermetic Centrifugal Liquid Chillers with PIC 6 Controls and R-134a/R-513A 50/60 Hz
Brand:
Carrier
| Category:
Chiller
| Size: 22.46 MB
Table of Contents
Table of Contents
1
Safety Considerations
2
Introduction
3
Abbreviations and Explanations
4
Chiller Familiarization (Fig. 1 and 5)
4
Chiller Information Nameplate
4
System Components
4
Cooler
4
Condenser
4
Motor-Compressor
4
Control Panel
4
Power Panel (19XR2-E)
4
Power Panel (19XR6/7)
4
Refrigeration Cycle
10
Motor and Oil Cooling Cycle
11
VFD Cooling Cycle
11
Lubrication Cycle
12
Summary
12
Details
12
Bearings
12
Oil Reclaim System
12
Starting Equipment
15
Unit-Mounted Vfds
15
Parts Identification and Location
15
Unit-Mounted Starters
20
Solid-State Starter
20
Wye-Delta Starter
20
Free-Standing Starters/Vfds
20
Controls
20
Definitions
20
General
20
PIC 6 System Components
20
Start-Up/Shutdown/ Recycle Sequence
21
Local Start/Stop Control
21
Lubrication Control
23
Shutdown
23
Before Initial Start-Up
23
Job Data Required
23
Equipment Required
23
Remove Shipping Packaging
23
Open Oil Circuit Valves
23
Tighten All Gasketed Joints
24
Check Chiller Tightness
24
Refrigerant Tracer
26
Leak Test Chiller
26
Standing Vacuum Test
26
Piping
28
Chiller Dehydration
28
Inspect Water Piping
28
Check Relief Valves
28
Check the Optional Pumpout Compressor Water
28
Identify and Check Starter/Vfd
28
Mechanical Starter
29
Benshaw Redistart MX3™ Solid-State Starter
29
VFD Starter
29
Verify Condition of Installation
29
Inspect Wiring
29
Carrier Comfort Network (CCN) and Local Equipment Network (LEN) Interface
30
Check Starter
30
Oil Charge
30
Power up Controls and Check Oil Heater
31
Software Configuration
31
Input the Design Set Points
31
Input the Local Occupied Schedule
31
Input Service Configurations
31
Field Set up and Verification
34
Perform a Controls Test (Quick Test/Quick Calibration)
36
Check Optional Pumpout System Controls and Compressor
37
Charge Refrigerant into Chiller
37
Initial Start-Up
39
Preparation
39
Check Motor Rotation
39
Check Oil Pressure and Compressor Stop
39
To Prevent Accidental Start-Up
39
Check Chiller Operating Condition
39
Instruct the Customer Operator
39
Operating Instructions
40
Operator Duties
40
Prepare the Chiller for Start-Up
40
To Start the Chiller
40
Check the Running System
40
To Stop the Chiller
40
After Limited Shutdown
40
Preparation for Extended Shutdown
40
Pumpout and Refrigerant Transfer Procedures
41
Preparation
41
After Extended Shutdown
41
Cold Weather Operation
41
Manual Guide Vane Operation
41
Refrigeration Log
41
Operating the Optional Pumpout Unit (Fig. 44)
43
General Maintenance
46
Refrigerant Properties
46
Adding Refrigerant
46
Adjusting the Refrigerant Charge
46
Refrigerant Leak Testing
46
Leak Rate
46
Test after Service, Repair, or Major Leak
46
Repair the Leak, Retest, and Apply Standing Vacuum Test
46
Checking Guide Vanes
46
Trim Refrigerant Charge
48
Weekly Maintenance
48
Check the Lubrication System
48
Scheduled Maintenance
49
Service Ontime
49
Inspect the Control Panel
49
Changing Oil Filter
49
Oil Specification
49
Oil Changes
49
Refrigerant Filter
49
VFD Refrigerant Strainer (if Equipped)
50
Oil Reclaim Filter
50
Inspect Refrigerant Float System
50
Inspect Relief Valves and Piping
51
Compressor Bearing and Gear Maintenance
51
Inspect the Heat Exchanger Tubes and Flow Devices
51
Water Leaks
51
Water Treatment
51
Inspect the Starting Equipment or VFD
51
Recalibrate Pressure Transducers
52
Optional Pumpout System Maintenance
52
Ordering Replacement Chiller Parts
52
Troubleshooting Guide
53
Overview
53
Checking Display Messages
53
Checking Temperature Sensors
53
Checking Pressure Transducers
57
High Altitude Locations
57
Quick Test
57
Pumpdown/Lockout
57
Physical Data
57
Structure
110
Appendix A - Pic 6 Screen and Table
111
Appendix B - Ccn Communication Wiring for Multiple Chillers (Typical)
112
Appendix C - Maintenance Summary and Log Sheets
113
Index
116
Initial Start-Up Checklist
117
Centrifugal Liquid Chiller
117
Carrier AquaEdge 19XR series Installation Instructions Manual (80 pages)
Single-Stage Semi-Hermetic Centrifugal Liquid Chillers with PIC II Controls and HFC-134a 50/60 Hz
Brand:
Carrier
| Category:
Air Conditioner
| Size: 6.26 MB
Table of Contents
Safety Considerations
1
Installation Instructions
1
General
2
Table of Contents
2
Introduction
2
General
2
Job Data
2
Installation
2
Step 1 - Receive the Machine
2
Inspect Shipment
2
Identify Machine
3
Installation Requirements
3
Provide Machine Protection
3
Step 2 - Rig the Machine
3
Rig Machine Assembly
3
Frame
6
Frame
7
Frame
8
Frame
9
Frame
10
Frame
11
Frame
12
Frame
13
Rig Machine Components
27
Step 3 - Install Machine Supports
31
Install Standard Isolation
31
Install Accessory Isolation
31
Install Spring Isolation
32
Step 4 - Connect Piping
34
Install Water Piping to Heat
34
Install Vent Piping to Relief Valves
41
Install Circuit Breaker Handle
43
Step 5 - Make Electrical Connections
43
Connect Control Inputs
43
Connect Control Outputs
46
Connect Starter
46
Carrier Comfort Network Interface
73
Optional Upc Open Controller Wiring
74
Step 6 - Install Field Insulation
78
Checklist
79
Advertisement
Advertisement
Related Products
Carrier ASPAX1CCA015
Carrier ASBFE600BA
Carrier AY020
Carrier AY060
Carrier AK
Carrier AC-362
Carrier AC-513
Carrier AC-91223
Carrier AC-11133
Carrier AR TXHQB Series
Carrier Categories
Air Conditioner
Heat Pump
Furnace
Thermostat
Chiller
More Carrier Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL