: Jan. 9 2004
1
11) Install a new knurled belt.
12) Pass the knurled belt shaft through the
knurled belt assembly. (Be careful of the di-
rection of the roller holder.)
13) Install the knurled belt shaft to the swing
unit. (Follow the installing sequence of Pro-
cedure 8) → procedure 2).)
14) Install the swing unit to the finisher. (Lift
the buffer roller section [17] and hang two
swing unit stoppers [18]. Check that the
shaft section [19] is in the groove. )
CHAPTER 6 MAINTENANCE AND INSPECTION
[19]
Figure 6-112
[18]
Figure 6-113
6-7