5
Boiler block assembly
Installing the cable entry
V Secure the cable entry to the boiler back panel hole.
V Slide rubber hood [1] over the temperature sensor and
connect temperature sensor lead.
Insulating the connecting block
V Cut out the insulating shells of the connecting block at
the indicated and required positions.
V Slide the two halves of the insulation box onto the
connection profile.
36
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
Fig. 48 Installing the cable entry
1
Rubber sleeve
Fig. 49 Cutting out the insulating shells
Fig. 50 Insulating the connection profile.
1
6 720 615 876-48.1RS
6 720 615 876-49.1RS
6 720 615 876-50.1RS