Buderus Logano G225 Installation And Service Instructions Manual page 57

Fan-assisted low temperature/condensing boiler
Table of Contents

Advertisement

Condition-based maintenance
1.
Shutting down the heating system
2.
Remove and clean hot gas baffels
3.
Clean hot gas flues (heating surfaces) and combustion chamber and
afterwards refit hot gas baffels in original positions
4.
Check and, if required, replace gaskets/packing cord on the burner and
burner door
5.
Start up the heating system
6.
Final check of the servicing work
7.
Checking safe and proper functioning in operation
Confirmation of properly completed servicing
Tab. 15 Service record
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
Company stamp/
Company stamp/
signature
signature
Tab. 16 Maintenance log (continued)
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
Date:______
Date:______
Company stamp/
Company stamp/
signature
signature
Heating system servicing
Page
Date:______
Date:______
50
52
52
52
46
Company stamp/
Company stamp/
signature
signature
Date:______
Date:______
Company stamp/
Company stamp/
signature
signature
9
Date:______
Company stamp/
signature
Date:______
Company stamp/
signature
57

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logano plus gb225

Table of Contents