Conversion Of Microsam Basic Device As09; Preparation For Use Of Analysis Modules Of Type A - Siemens MicroSAM Operating Instructions Manual

Table of Contents

Advertisement

Service and maintenance

6.4 Conversion of MicroSAM basic device AS09

6.4
Conversion of MicroSAM basic device AS09
A solenoid valve MV5 is fitted in the MicroSAM basic device of release version 09 (AS09).
You can also prepare the MicroSAM basic device as a GC which can be operated with
analysis modules of type A.
6.4.1

Preparation for use of analysis modules of type A

Procedure
1. Terminate measuring mode of the device.
2. Deactivate the detectors using the operating software.
3. Save the configuration in the flash memory.
4. Switch off the device.
5. Shut off the carrier gas and sample gas supplies.
6. Open the two housing covers.
7. Deinstall the analysis module type D.
8. Install the analysis module type A.
9. Remove the RSP module.
94
Operating Instructions, 06/2012, C79000-G5376-C560-07
MicroSAM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents