Mounting; On-Site Requirements; Space Requirement - Siemens MicroSAM Operating Instructions Manual

Table of Contents

Advertisement

Mounting

4.1

On-site requirements

Explosion hazard
Only make the terminal connections and only close the device when it is disconnected from
the supply.
Only start up the device when it has been correctly connected and when the housing has
been closed.
Use in non-hazardous areas
Make the Ex symbol permanently illegible if the device is used in non-hazardous areas.
It is essential to observe the following conditions:
● Permissible ambient temperature from -20 to +55 °C
● Maximum permissible relative humidity 90%
● 24 V DC supply voltage
● Use of appropriate lightning protection equipment
● Grounding must be possible
● Use of gas connections and the gas purity requirements as described in sections Gas
● Protection against direct solar radiation, even when the sun is low
4.2

Space requirement

The spacing from a wall or the next chromatograph must be at least 300 mm on both sides.
The spacing from the ceiling and floor must be at least 200 mm.
MicroSAM
Operating Instructions, 06/2012, C79000-G5376-C560-07
WARNING
WARNING
lines (Page 58) and Sample lines (Page 59).
4
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents