Honeywell IAQPoint2 User Manual page 1342

Air quality monitor
Hide thumbs Also See for IAQPoint2:
Table of Contents

Advertisement

Available languages

Available languages

Using the IAQPoint
Programming Menus
A confirmation screen is briefly displayed and the zero calibration begins.
A success or failure message is displayed and the screen returns to the
main menu option.
Calibrating the CO
This option allows users to calibrate the sensor's span.
Note: When calibrating a duct mounted unit, the unit must be removed
from its base to ensure proper calibration.
Before starting the calibration (using the programming menus),
connect the regulator to the gas cylinder.
Adjust the flow rate to 0.1 L/min.(for the 2000 ppm range)
Connect the tubing from the regulator to the sensor, as shown in the
image at left.
Let the gas flow for at least 10 minutes before starting the calibration
Scroll to the "
select.
The next screen allows you to specify the span calibration gas
concentration value.
26
Sensor
2
Start exposing the sensor to the calibration gas at least
10 minutes before starting and throughout the calibration
process.
Set Span" main menu option and press Enter to
CO
2
IAQPoint User Manual
*Menu*
In Calib
CO
Set Zero
2
SUCCESS
* Menu *
CO
Set Span
2
Set Span Gas
2000
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E3point

Table of Contents